My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/14/1990
CBCC
>
Meetings
>
1990's
>
1990
>
8/14/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/5/2015 1:23:16 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/14/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG <br />14 1990 <br />BOOK <br />SEA -OAKS <br />WW TREATMENT PLANT EXPANSION CONTRACT W/KIMBALL <br />LLOYD <br />Director Pinto reviewed the following: <br />DATE: JULY 31, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO P <br />DIRECTOR OF UTIL Y SE ICES <br />SUBJECT: SEA OAKS WASTEWATER TREATMENT PLANT <br />EXPANSION PROJECT <br />IRC PROJECT NO. US-90-02-DC/ED <br />PREPARED JOHN FREDERICK LANG <br />AND STAFFED ENVIRONMENTAL SPECIALIST <br />BY: DEPARTMENT OF UTILITY SERVICES <br />BACKGROUND <br />The Sea Oaks Wastewater Treatment Plant, a .21 MGD facility, was <br />purchased from the franchise utility Sea Oaks Utility Company, in <br />order to provide a regional facility for the North Beach area. The <br />existing clarifiers at the facility will support a .8 MGD plant and <br />an engineering selection process was begun so as to provide for <br />expansion design services. The engineering selection committee <br />ranked Kimball/Lloyd and Associates, Inc., as the first firm to be <br />contacted for engineering services for this project. <br />ANALYSIS <br />The firm of Kimball/Lloyd has provided a conceptual layout of the <br />plant expansion to .8 MGD, a more efficient use of the existing <br />facilities. Proper insurance documentation has been provided, for <br />these services. A cost estimate for construction, engineering <br />services and total project cost have also been provided. <br />Engineering costs for the project fit within the FmHA Form No. <br />1942-19 median fees for professional engineering services <br />guidelines. A listing of personnel categories for billing purposes <br />is included. <br />The construction estimate is $2,162,000.00, the engineering basic <br />services upset limit is $152,000.00, and additional services are <br />estimated at $101,100.00, for a total estimated project cost of <br />$2,415,000.00. <br />RECOMMENDATION <br />The Department of Utility Services recommends that the Board of <br />County Commissioners approve and execute the attached contract and <br />proceed to expand the Sea Oaks .21 MGD wastewater treatment plant <br />into the .8 MGD North Regional Wastewater Treatment Plant. <br />Funding for this project will be provided from the wastewater impact <br />fees account and/or bond funds. <br />Director Pinto pointed out to the Board that although this <br />isn't spelled out in the contract, the award of the contract to <br />this company was based on Mr. Lloyd's participation in the design <br />of this plant, and he felt that should be noted. <br />75 <br />s � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.