My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/28/1990
CBCC
>
Meetings
>
1990's
>
1990
>
8/28/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 10:50:10 AM
Creation date
6/16/2015 9:41:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/28/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�'14 1 PAGE 8Z <br />Proposal Request #14 - Door Hardware <br />The architectural drawings did not indicate the hardware required. <br />The General Contractor originally asked for $1,058.88 and the price <br />was later dropped to $414.00. This PR was combined with PR #15 and <br />omitted. <br />Proposal Request #15 - Plyform <br />The plans called for H.D.O. form board and the General Contractor <br />used a different product. It was determined that the exact <br />requirement of the spec could not be met. This PR was negotiated <br />to omit and combine with PR #14. <br />Proposal Request #16 - Catch Basin <br />The General Contractor used a pre-existing catch basin. The <br />architectural drawings indicated that a new one was to be provided. <br />It was negotiated to void and omit this PR in exchange for control <br />joint caulking (A.S.I. #5). <br />RECOMMENDATION: <br />The Construction Manager and staff recommends that the Board of <br />County Commissioners authorize the Architect to issue Change Order <br />#4 for Proposal Request #12, #13, and #17 in the amount of $12,250 <br />and authorize the Chairman to execute the necessary documents. <br />The original bid award for the contract was $5,103,000. If the <br />Board of County Commissioners approve Change Order #4, the status <br />of funding for Phase III of the Indian River County Jail will be <br />as follows: <br />Original bid award for construction $5,103,000 <br />Change Order #1 Ten days <br />Change Order #2 8,853 <br />Change Order #3 11,030 <br />Change Order #4 12,250 <br />Total $5,135,133 <br />Since no additional construction time is being added other than <br />the ten days provided in Change Order #1, the completion date for <br />Phase III remains March 11, 1991. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously (4-0) approved <br />Change Order #4 as recommended by staff and noted that <br />the completion date for Phase III remains March 11, 1991. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.