Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
� � r <br />CHANGE <br />OWNER ❑ <br />Admin. <br />ARCHITECT <br />a <br />ORDER <br />CONTRACTOR <br />Budges <br />FIELD❑ <br />AIA DOCUMENT G701 <br />OTHER D <br />OTHE <br />PROJECT: Indian River County Jail, Phase III CHANGE ORDER NUMBER: Four (4) <br />(name, address) DATE: September 5, 1990 <br />TO CONTRACTOR: ARCHITECT'S PROJECT NO: 2140 <br />(name, address) CONTRACT DATE: October 17, 1989 <br />Robert F. Wilson, Inc. <br />P.O. Box 760 <br />Vero Beach, FL 32961 <br />The Contract is changed as follows: <br />1. <br />2. <br />3. <br />4. <br />5. <br />CONTRACT FOR: Phase III Addition <br />Provide Plaster Wall Finish For W.R.F.A.I. Proposal <br />Request No. 12 <br />Change Ricochet Wall -Per W.R.F.A.I. Proposal <br />Request No. 13 <br />Provide Changes to boor #108A and Provide Credit for Use <br />of B -B Plyform Plywood for W.R.F.A.I. Proposal Request <br />Nos. 14 and 15. <br />Provide Credit for New Catch Basin for W.R.F.A.I. Proposal <br />Request No. 16 and Revise Control Joint Detail per W.R.F.A.I. <br />A.S.I. No. 5 <br />Proposal Request No. 17 Denied <br />TOTAL CHANGE ORDER NO. 4 <br />No Change in Contract Days <br />Not valid until signed by the Owner, Architect and Contractor. <br />ADD $ 6,500.00 <br />ADD $ 5,750.00 <br />NO COST <br />Indian Rivtr Ca <br />AFproved Date <br />Admin. <br />9_ _ <br />Legal <br />CONTRACTOR <br />Budges <br />Risk Mgr. <br />it. <br />$12,250.00 <br />The original (Contract Sum) (Guaranteed Maximtun Price) was ........................ $5,103,000.00 <br />Net change by previously authorized Change Orders ............................... $ 19,883.00 <br />The (Contract Stun) (ClI a m=cd prior to this Change Order was .......... $5,122,883.00 <br />The (Contract Sum) (Ox kbft3i=wftkvj will be (increased) (dm ) <br />( ed) by this Change Order in the amount of ............................ S 12,250.00 <br />The new (Contract Sum) (GWomr ixg including this Change Order will be .. S 5 ,135 , 133.00 <br />The Contract Time will be (i2am=M (dacltm9eg) (unchanged) by Zero ( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is 435 Days After Receipt of Notice to <br />Proceed. <br />NOTE: This summary docs not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />W R FRIZZELL ARCHITECTS, <br />INC. ROBERT F. WILSON, INC, <br />INDIAN RIVER COUNTY <br />ARCHITECT <br />CONTRACTOR <br />OWNER <br />5600 PGA Blvd., Suite 200 <br />P.O. Box 760 <br />1840 25th Street <br />Address <br />Address <br />Address <br />Palm Beach Gardens FL 33418 <br />Ver L 1 <br />Vero Beach, FL <br />32960 <br />BY <br />/ <br />' <br />DATE �sT//�/ <br />TF <br />DATE <br />AIA DOCUMENT G701 • CHAKGE.ORDER <br />• 198 EDITION • AIA0 • ©1987 • THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 <br />G701-1987 <br />19 <br />AUG 2 8 1990 aooK �i PaGF 8j <br />