My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/4/1990
CBCC
>
Meetings
>
1990's
>
1990
>
9/4/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:42:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/04/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 0 4199&- <br />�> Fret- � <br />F. -New IRC Health Clinic Fire and Burglar Alarm Systems <br />The Board reviewed the following memo dated 8/23/90: <br />DATE: AUGUST 23, 1990 <br />TO: HONORABLE BOARD OF COUNTY COMMISSIONERS <br />THRU: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: H.T. "SONNY" DEAN, DIRECTO <br />DEPARTMENT OF GENERAL SEMMES <br />SUBJECT: NEW INDIAN RIVER COUNTY HEALTH CLINIC <br />FIRE AND BURGLAR ALARM SYSTEMS <br />BACKGROUND: <br />We presently use Alarm Specialists of Vero Beach, Inc. for <br />installation, maintenance and monitoring of the fire and burglar <br />alarm systems in all our facilities. We have a open -end -contract <br />that is renewed on a annual basis for the monitoring services. <br />ANALYSIS: <br />The subject facility will be at a point where installation of the <br />conduit and wiring is required to facilitate the necessary associated <br />equipment for monitoring. This work was not included in the general <br />contract nor was it a line item in the budget. <br />FUNDING: <br />Cost for the above is $8,458.00. Funds are available in the <br />construction budget to cover this item. <br />RECOMMENDATIONS: <br />In view of the above, staff requests permission and authorization <br />from the Board to have the necessary wiring installed in the subject <br />building and allow their Chairman to execute the necessary contract. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />the contract with Alarm Specialists of Vero Beach, Inc. <br />for the necessary wiring in the new IRC Health Clinic, <br />set out in the above staff recommendation. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.