My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/1990
CBCC
>
Meetings
>
1990's
>
1990
>
12/4/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:47 PM
Creation date
6/16/2015 10:00:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/04/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Director Jim Davis advised that after the <br />acquisition of these two parcels for Phase IV of the Boulevard, <br />there is only one more. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the purchase of parcels from C. Bobo, William Selma <br />Luther and J. Luther Groves, as set out in the above <br />staff recommendation. <br />CONTRACTS OF SALE WILL BE PLACED ON FILE IN THE OFFICEOF THE <br />CLERK TO THE BOARD WHEN FULLY EXECUTED AND RECEIVED ( %?%�rWrL�/� <br />REPLACEMENT OF WABASSO BRIDGE FENDER SYSTEM ALONG THE INTRACOASTAL <br />WATGRWAV <br />The Board reviewed the following memo dated 11/26/90: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., Wl <br />Public Works Director / <br />SUBJECT: Replacement of Wabasso Bridge Fender System along <br />the Intracoastal Waterway JBridge # 880053) <br />DATE: November 26, 1990 FILE: wabasso.agn <br />DESCRIPTION AND CONDITIONS <br />Staff attended a recent Florida DOT Bridge Inspection <br />meeting, and the DOT's Bridge Consultant, Parsons, <br />Brinckerhoff, Quade and Douglas, Inc., is recommending major <br />repairs to the Wabasso Causeway High Level bridge including: <br />1) Patch corner spall on Pile "B" of Bent 18 under the <br />Cap. <br />2) Fill voids in Pier 3 footing and remove all loose <br />concrete from the footing of Pier 15 and patch spall. <br />3) Remove debris from cap tops. <br />4) Tighten all nuts in bearing assemblies. Re -paint <br />bearing assemblies and bearing hardware. <br />5) Patch beams as required. <br />6) Seal expansion joints. <br />7) Seal cracks in underside of the sidewalks. <br />8 Patch spalls in north parapet. <br />9) Replace entire fender system. <br />10) Replace navigational lights. <br />11) Repaint utility hangers and pipe. <br />12) Concrete bulkhead repair/replacement. <br />DEC 41990 29 600K S20 FAGE �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.