Laserfiche WebLink
W <br />M <br />about such a long range project as building an 18-20 million <br />dollar project, why would we not give a tremendous weight to <br />flexibility? <br />Administrator Chandler advised that staff has done that. He <br />agreed that Concept M does give the ultimate degree of flexibil- <br />ity, but Concept L meets our needs both now and well into the <br />future, and from a dollars and cents standpoint that would be the <br />route to go. There is about half a million dollar difference in <br />terms of land between L and M, and staff has tried to be <br />conservative in their figures. <br />Concepts L, M, and J, are as follows: <br />U_ <br />El <br />ir <br />i r " ti <br />St <br />—� <br />..'.�-� —[o,w sru[t ■ .. __totes aruat_ 7I <br />y <br />41 <br />MOK <br />I <br />