Laserfiche WebLink
INDIAN RIVER COUNTY <br />RINGS HIGHWAY CORRIDOR IMPROVEMENTS <br />INTERSECTION IMPROVEMENTS CR510 & AlA <br />AMENDMENT NO. 3 <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />Dated June 6, 1989 <br />This is an amendment to the existing PROFESSIONAL SERVICES <br />AGREEMENT (AGREEMENT) dated June 6, 1989 between Gee & Jenson, <br />Engineers, Architects & Planners, Inc. (ENGINEER) and Indian <br />River County (COUNTY). The Amendment is for services to be <br />performed by ENGINEER pursuant to the terms and conditions of the <br />AGREEMENT related to the intersection improvements for CR510 at <br />SR AlA beyond the scope of the original agreement dated June 6, <br />1989. <br />The ENGINEER agrees to perform the <br />services as described in the following <br />tasks as defined in Exhibit A attached <br />herein. A summary of Total Cost for <br />presented in Exhibit A. <br />SCOPE OF SERVICE <br />additional professional <br />text and the specific <br />hereto and incorporated <br />the additional work is <br />The section, of the original AGREEMENT entitled "SECTION III - <br />SCOPE OF SERVICES" is revised as follows: <br />1. Insert the following paragraph 2(e) in Sub -section B, <br />"Project Specific Services". <br />e. Prepare signalization plans for the intersection of <br />CR510 and SR AIA. <br />2. Insert* the following paragraph 8 in place of the existing <br />paragraph 8 in Sub -section B. "Project Specific Services". <br />8. Prepare SJRWMD Stormwater Discharge Facility Permit <br />Application, FDOT Road Modification Permit and FDOT <br />Traffic Control Devices Permit. <br />TIME FOR COMPLETION <br />Insert the following paragraph D in the Section of the original <br />AGREEMENT entitled "SECTION IV - TIME FOR COMPLETION". <br />D. Signalization Design Phase <br />Signalization plans shall be delivered within sixty (60)days <br />from written Notice -to -Proceed on the design which will be <br />issued by the County. <br />COMPENSATION <br />Original AGREEMENT "SECTION V - COMPENSATION" shall be revised by <br />increasing the compensation due the ENGINEER for Part B <br />Intersection Improvements to CR510 at SR AlA by $4,912.00. <br />The total described items for Part B, including previous <br />amendments is increased from $59,567.00 to $64,479.00 and the <br />Grand Total for the AGREEMENT is increased from $145,91:4 to a f�19 I <br />new Grand Total of 141 , oo2.ou <br />4145,1 J 4 . cO <br />73 <br />NDO� ,.fPm-�) ,� <br />