My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/15/1991
CBCC
>
Meetings
>
1990's
>
1991
>
1/15/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:07 PM
Creation date
6/16/2015 10:04:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/15/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s � r <br />PROPOSAUCONTRACT <br />�6171e� Wilson's <br />9�0 MEMBER <br />Petroleum Equipment, Inc. willow <br />EN <br />SEC 1990 N' <br />n 1803 South 31st Street <br />RECPIIIIIIIIIIIIVI <br />EIVED Ft. Pierce, Florida 34947 0 <br />d-'(407) m (407) 468-3689 7EUM EQUIPMENT IV <br />IC03 �' FAX (407) 464-5803 <br />ti <br />b; <br />SUBMITTED TO: <br />NAME: Indian River County <br />ADDRESS: '4055 - 41st Avenue <br />CITY: Vero Beach STATE: Fl ZIP CODE:_ 32960 <br />PHONE: 407-569-6700 <br />SUB ADDRESS: Sheriffs Maintenance Facility, Vero Beach <br />DATE: 10-24-90 ATTN.; R.D.Auton <br />REF. NUMBER: STATE LICENSE PC6•045.049 <br />WE ARE PLEASED TO QUOTE ON THE FOLLOWING WORK: <br />Furnish labor, equipment, materials and permits for the following scope of work: <br />Saw -cut and excavate around two (2) existing fill manholes and vapor recovery <br />manholes. Furnish and install two (2) OPW-1-4000C containment manholes and <br />two (2) OPW-104A manholes.. Furnish and install new OPW caps and adaptors. <br />Backfill compact and pour 4'x8'x10" concrete using 6 x 6 10/10 wire mesh and <br />3,000 psi concrete, to proper grade. <br />For The Sum Of $1,250.00 per tank, two tanks for the Total Sum Of $2,500.00 <br />We appreciate the opportunity you'have extended us to quote on this work and we <br />would like to thank you in advance for your consideration. <br />We hereby propose to furnish labor and materials • complete In accordance with the above specifications, for the sum of: <br />see above . dollars (S <br />with payment to be made as follows: payment in full upon completion <br />All material Is guaranteed to be as specified. All work to be completed In a workmanlike manner according to standard practices. An <br />alteration or deviation from above specifications Involving extra costs, will be executed only upon written orders, and will become <br />an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. This <br />proposal subject to accept a 60 days and Is v d thereafter at the option of the undersigned. <br />Authorized Signature Title <br />'JAN lb i9 1 <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Scurlock, the Board unanimously approved <br />the modification as proposed by Wilson -Petroleum and <br />approved Budget Amendment 014, as follows: <br />9 <br />,u 4,,,.,.L <br />
The URL can be used to link to this page
Your browser does not support the video tag.