My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/12/1991 (2)
CBCC
>
Meetings
>
1990's
>
1991
>
2/12/1991 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:08 PM
Creation date
6/16/2015 10:07:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/12/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: I.R.C. Utilities Warehouse CHANGE ORDER NUMBER: 1 <br />(name, address) Ixora Utilities complex <br />Vero Beach, F1 DATE: 12/21/90 <br />TO CONTRACTOR.iunley—Hubbard Const. ARCHITECT'S PROJECT NO: 4005 <br />(name, address) P.O. Box 6388 <br />Vero Beach, F1 32961 CONTRACT DATE: 12/20/90 <br />CONTRACT FOR: Metal Building <br />The Contract is changed as follows: <br />Add second personell door as required by building department $ 550. <br />Add 4811 fan and vent at building end for ventalation $ 1,475. <br />THE FOLLOWING ITEMS HAVE BEEN REQUIRED BY THE PLANING DEPARTMENT <br />AS A CONDITION FOR THE ISSUANCE OF THE SITE PLAN. -- <br />Export excess building pad material from site. $ 1,530. <br />Excavate dry retention area, export excess material $15,647. <br />Grade swales, export excess material $ 6,435. <br />Cut in road, remove excess fill and prepare subbase & base $28,207, <br />Indian Riva Ca Approved <br />Date <br />Admin. !(2, <br />7 <br />Legal <br />7.6 -y <br />Budget <br />Ui'1 i�tit;s <br />Risk Mgr. <br />Not valid until signed by the Owner, Architect and Contractor. <br />The original (Contract Sum) ( )was $ $ 44,480 <br />Net change by previously authorized Change Orders ............................... S $ 0 <br />-The (Contract Sum) ( prior to this Change Order was .......... S $ 44,480 <br />The (Contract Sum) be (increased)4d"rsase ) <br />(und4fftcd)-by this Change Order in the amount of ........... .... .. $ $ 53,844 <br />The new (Contract Sum) (�__ `d Uaximu= e)-tnclucUng this Change Order will be .. S $ 98,324 <br />The Contract Time will be (unchanged) by <br />The date of Substantial Completion as of the date of this Change Order therefore is (+0 ) days. <br />NOTE: This summary does not reflect changes in the Contract Sum. Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />ARCHITECT <br />Address <br />Hunley Hubbard Const <br />CONTRACTOR <br />P.O. Box 6388 <br />Address <br />Vero Beach, F1 <br />BY BY <br />DATE <br />DATE — <br />12/21/90 <br />_ <br />AIA DOCUMENT G701 • CHANGE ORDER • 19$7 EDITION • AIA° • ©1087 • THE <br />AMERICAN INSTITUTE OF ARCIIITECTS. 1715 NEW YORK AVE.. NW, WASHINGTON. DC. 20W, <br />11 <br />r <br />Indian River County <br />'I F10 25th Street <br />Address <br />Vero Beach, F1 <br />BY <br />DATE 12/21/90 <br />G701-1987 <br />BOOK <br />
The URL can be used to link to this page
Your browser does not support the video tag.