My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/5/1991
CBCC
>
Meetings
>
1990's
>
1991
>
3/5/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:08 PM
Creation date
6/16/2015 10:11:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/05/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 5 91 <br />BOOK � � PAGE 4 5 <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />the Engineering Services Agreement with Post, Buckley, <br />Schuh, and Jernigan, Inc. for repair of the Wabasso <br />Causeway Bridge for the amounts set out in the above <br />staff recommendation. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />ENGINEERING CONTRACT - DESIGN AND CONSTRUCTION INSPECTION OF <br />VARIOUS WATER MAINS AND SUBDIVISION DISTRIBUTION SYSTEMS <br />The Board reviewed the following memo dated 2/15/91: <br />DATE: FEBRUARY 15, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECT R ESU LITY SERVICES <br />STAFFED AND H. �"D ' O ER, P.E. <br />PREPARED BY: ENVIRONMENTAL ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: OWNER/ENGINEER CONTRACT <br />ENGINEERING SERVICES FOR THE DESIGN AND CONSTRUCTION <br />INSPECTION OF VARIOUS WATER MAINS AND SUBDIVISION <br />DISTRIBUTION SYSTEMS <br />IRC PROJECT NO. UW -91 -02 -DS <br />On January 29, 1991, the Board of County Commissioners authorized <br />the Department of Utility Services to conduct negotiations with the <br />selected firms and to proceed with an agreement based upon <br />negotiations. <br />ANALYSIS: <br />Negotiations with Masteller & Moler Associates, Inc., for Phase I of <br />the Water Expansion Plan have been completed, and a "Standard Form <br />of Agreement between Owner and Engineer for Professional Services" <br />has been submitted to the County for approval. Phase I includes <br />transmission mains on 27th Avenue, on 4th Street, and on 5th Street, <br />S.W., and includes water distribution facilities for Indian River <br />Heights, Moreland Subdivision, Clearview Terrace, Bonny Vista Acres, <br />Emerson Villas, and Graves Annex. <br />The estimated lump sum fee for Phase I design services with one <br />prime contractor is $134,750.00. This fee will be adjusted when <br />firm construction costs are known, and shall be based on FmHA <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.