Laserfiche WebLink
r <br />percentages. Additional services of Engineer are estimated to be <br />$81,020.00 with one contractor, and include field surveying, soils <br />investigation, computer disk copies of as -built drawings, assessment <br />roll, and resident project services. If two contractors are <br />utilized, additional services would total $95,140.00. <br />All fees shall conform to FmHA guidelines. <br />RECOMMENDATION• <br />The Department of Utility Services recommends approval of the <br />Agreement with Masteller & Moler Associates, Inc., for Phase I <br />design and additional services for the estimated fees as stated <br />above. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />the Engineering Agreement with Masteller & Moler <br />Associates, Inc. for Phase I design, as set out in the <br />above staff recommendation. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />REIMBURSEMENT TO VERO_ BEACH_ OCEANFRONT_ LIMITED PARTNERSHIP_ FOR <br />OVERSIZING OF OFF-SITE UTILITIES <br />The Board reviewed the following memo dated 2/25/91: <br />DATE: FEBRUARY 25, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. McCAIN <br />AND STAFFED CAPITAL PROJECTSR <br />BY: DEPARTMENT OF UTI SERVICES <br />SUBJECT: REIMBURSEMENT TO VERO BEACH OCEANFRONT LIMITED <br />PARTNERSHIP FOR OVERSIZING OF OFF-SITE UTILITIES <br />BACKGROUND <br />During the construction of Seaview Subdivision in the North Beaches <br />on A1A, certain off-site water_ lines were constructed. The <br />developer is now requesting certain reimbursements for oversizing <br />these -off-site utilities. <br />� <br />45 <br />I <br />