CONTRACTOR, any Subcontractor, Supplier, or any <br />other individual or entity directly or indirectly employed <br />by any of them to perform any of the Work, or anyone <br />for whose acts any of them may be liable, shall be <br />remedied by CONTRACTOR (except damage or loss <br />attributable to the fault of Drawings or Specifications <br />or to the acts or omissions of OWNER or ENGINEER <br />or ENGINEER's Consultant, or anyone employed by <br />any of them, or anyone for whose acts any of them <br />may be liable, and not attributable, directly or <br />indirectly, in whole or in part, to the fault or negligence <br />of CONTRACTOR or any Subcontractor, Supplier, or <br />other individual or entity directly or indirectly employed <br />by any of them). CONTRACTOR's duties and <br />responsibilities for safety and for protection of the <br />Work shall continue until such time as all the Work is <br />completed and ENGINEER has issued a notice to <br />OWNER and CONTRACTOR in accordance with <br />paragraph 14.07.13 that the Work is acceptable <br />(except as otherwise expressly provided in connection <br />with Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified <br />and experienced safety representative at the Site <br />whose duties and responsibilities shall be the <br />prevention of accidents and the maintaining and <br />supervising of safety precautions and programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for <br />coordinating any exchange of material safety data <br />sheets or other hazard communication information <br />required to be made available to or exchanged be- <br />tween or among employers at the Site in accordance <br />with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protec- <br />tion of persons or the Work or property at the Site or <br />adjacent thereto, CONTRACTOR is obligated to act to <br />prevent threatened damage, injury, or loss. <br />CONTRACTOR shall give ENGINEER prompt written <br />notice if CONTRACTOR believes that any significant <br />changes in the Work or variations from the Contract <br />Documents have been caused thereby or are required <br />as a result thereof. If ENGINEER determines that a <br />change in the Contract Documents is required be- <br />cause of the action taken by CONTRACTOR in <br />response to such an emergency, a Work Change <br />Directive or Change Order will be issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings <br />to ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data <br />shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified perfor- <br />mance and design criteria, materials, and similar data <br />to show ENGINEER the services, materials, and <br />equipment CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the information for the <br />limited purposes required by paragraph 6.17.E. <br />B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. Each Sample will be identified <br />clearly as to material, Supplier, pertinent data such as <br />catalog numbers, and the use for which intended and <br />otherwise as ENGINEER may require to enable ENGI- <br />NEER to review the submittal for the limited purposes <br />required by paragraph 6.17.E. The numbers of each <br />Sample to be submitted will be as specified in the <br />Specifications. <br />C. Where a Shop Drawing or Sample is required <br />by the Contract Documents or the schedule of Shop <br />Drawings and Sample submittals acceptable to ENGI- <br />NEER as required by paragraph 2.07, any related <br />Work performed prior to ENGINEER's review and <br />approval of the pertinent submittal will be at the sole <br />expense and responsibility of CONTRACTOR. <br />D. Submittal Procedures <br />1. Before submitting each Shop <br />Drawing or Sample, CONTRACTOR shall have <br />determined and verified: <br />a. all field measurements, quantities, <br />dimensions, specified performance criteria, <br />installation requirements, materials, catalog <br />numbers, and similar information with <br />respect thereto; <br />b. all materials with respect to intended <br />use, fabrication, shipping, handling, storage, <br />assembly, and installation pertaining to the <br />performance of the Work; <br />c. all information relative to means, <br />methods, techniques, sequences, and <br />procedures of construction and safety <br />00700-24 00700 - General Conditions REV 5-10-13.doc <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st St\Admim\bid documents\Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />