Laserfiche WebLink
precautions and programs incident thereto; <br />and <br />d. CONTRACTOR shall also have <br />reviewed and coordinated each Shop <br />Drawing or Sample with other Shop <br />Drawings and Samples and with the <br />requirements of the Work and the Contract <br />Documents. <br />2. Each submittal shall bear a stamp or <br />specific written indication that CONTRACTOR <br />has satisfied CONTRACTOR's obligations <br />under the Contract Documents with respect to <br />CONTRACTOR's review and approval of that <br />submittal. <br />3. At the time of each submittal, CON- <br />TRACTOR shall give ENGINEER specific <br />written notice of such variations, if any, that the <br />Shop Drawing or Sample submitted may have <br />from the requirements of the Contract <br />Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in <br />addition, shall cause a specific notation to be <br />made on each Shop Drawing and Sample sub- <br />mitted to ENGINEER for review and approval of <br />each such variation. <br />E. ENGINEER's Review <br />1. ENGINEER will timely review and <br />approve Shop Drawings and Samples in <br />accordance with the schedule of Shop <br />Drawings and Sample submittals acceptable to <br />ENGINEER. ENGINEER's review and <br />approval will be only to determine if the items <br />covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents <br />and be compatible with the design concept of <br />the completed Project as a functioning whole as <br />indicated by the Contract Documents. <br />2. ENGINEER's review and approval <br />will not extend to means, methods, techniques, <br />sequences, or procedures of construction <br />(except where a particular means, method, <br />technique, sequence, or procedure of con- <br />struction is specifically and expressly called for <br />by the Contract Documents) or to safety <br />precautions or programs incident thereto. The <br />review and approval of a separate item as such <br />will not indicate approval of the assembly in <br />which the item functions. <br />3. ENGINEER's review and approval of <br />Shop Drawings or Samples shall not relieve <br />CONTRACTOR from responsibility for any <br />variation from the requirements of the Contract <br />Documents unless CONTRACTOR has in <br />writing called ENGINEER's attention to each <br />such variation at the time of each submittal as <br />required by paragraph 6.17.D.3 and ENGI- <br />NEER has given written approval of each such <br />variation by specific written notation thereof <br />incorporated in or accompanying the Shop <br />Drawing or Sample approval; nor will any <br />approval by ENGINEER relieve CON- <br />TRACTOR from responsibility for complying <br />with the requirements of paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1. CONTRACTOR shall make correc- <br />tions required by ENGINEER and shall return <br />the required number of corrected copies of <br />Shop Drawings and submit as required new <br />Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in <br />writing to revisions other than the corrections <br />called for by ENGINEER on previous <br />submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule during all disputes or <br />disagreements with OWNER. No Work shall be <br />delayed or postponed pending resolution of any <br />disputes or disagreements, except as permitted by <br />paragraph 15.04 or as OWNER and CONTRACTOR <br />may otherwise agree in writing. <br />6.19 CONTRACTOR's General Warranty and <br />Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants <br />that all Work will be in accordance with the Contract <br />Documents and will not be defective. <br />CONTRACTOR's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper <br />maintenance or operation by persons other <br />than CONTRACTOR, Subcontractors, <br />Suppliers, or any other individual or entity for <br />whom CONTRACTOR is responsible; or <br />usage. <br />normal wear and tear under normal <br />00700 - General Conditions REV 5-10-13.doc <br />00700-25 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st St\Hdmim\bid documents\Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />