My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pursuant to paragraph 10.05; provided that, in <br />lieu of executing any such Change Order, an <br />appeal may be taken from any such decision in <br />accordance with the provisions of the Contract <br />Documents and applicable Laws and Regula- <br />tions, but during any such appeal, <br />CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule as provided in <br />paragraph 6.18.A. <br />10.04 Notification to Surety <br />A. If notice of any change affecting the general <br />scope of the Work or the provisions of the Contract <br />Documents (including, but not limited to, Contract <br />Price or Contract Times) is required by the provisions <br />of any Bond to be given to a surety, the giving of any <br />such notice will be CONTRACTOR's responsibility. <br />The amount of each applicable Bond will be adjusted <br />to reflect the effect of any such change. <br />10.05 Claims and Disputes <br />A. Notice: Written notice stating the general <br />nature of each Claim, dispute, or other matter shall be <br />delivered by the claimant to ENGINEER and the other <br />party to the Contract promptly (but in no event later <br />than 30 days) after the start of the event giving rise <br />thereto. Notice of the amount or extent of the Claim, <br />dispute, or other matter with supporting data shall be <br />delivered to the ENGINEER and the other party to the <br />Contract within 60 days after the start of such event <br />(unless ENGINEER allows additional time for claimant <br />to submit additional or more accurate data in support <br />of such Claim, dispute, or other matter). A Claim for <br />an adjustment in Contract Price shall be prepared in <br />accordance with the provisions of paragraph 12.01.13. <br />A Claim for an adjustment in Contract Time shall be <br />prepared in accordance with the provisions of <br />paragraph 12.02.8. Each Claim shall be accom- <br />panied by claimant's written statement that the adjust- <br />ment claimed is the entire adjustment to which the <br />claimant believes it is entitled as a result of said event. <br />The opposing party shall submit any response to <br />ENGINEER and the claimant within 30 days after <br />receipt of the claimant's last submittal (unless <br />ENGINEER allows additional time). <br />B. ENGINEER's Decision: ENGINEER will <br />render a formal decision in writing within 30 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. ENGINEER's <br />written decision on such Claim, dispute, or other <br />matter will be final and binding upon OWNER and <br />CONTRACTOR unless: <br />1. an appeal from ENGINEER's <br />decision is taken within the time limits and in <br />accordance with the dispute resolution <br />procedures set forth in Article 16; or <br />2. if no such dispute resolution <br />procedures have been set forth in Article 16, a <br />written notice of intention to appeal from <br />ENGINEER's written decision is delivered by <br />OWNER or CONTRACTOR to the other and to <br />ENGINEER within 30 days after the date of <br />such decision, and a formal proceeding is <br />instituted by the appealing party in a forum of <br />competent jurisdiction within 60 days after the <br />date of such decision or within 60 days after <br />Substantial Completion, whichever is later <br />(unless otherwise agreed in writing by OWNER <br />and CONTRACTOR), to exercise such rights or <br />remedies as the appealing party may have with <br />respect to such Claim, dispute, or other matter <br />in accordance with applicable Laws and <br />Regulations. <br />00700-31 00700 - General Conditions REV 5-10-13.doc <br />FAPublic Works1ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st StlAdmimlbid documents\Contract Documents100700 - General Conditions REV 5- <br />10-13.doc <br />