My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.6, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included. The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.6. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, CON- <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will be <br />acceptable. If any subcontract provides that the <br />Subcontractor is to be paid on the basis of Cost <br />of the Work plus a fee, the Subcontractor's <br />Cost of the Work and fee shall be determined <br />in the same manner as CONTRACTOR's Cost <br />of the Work and fee as provided in this para- <br />graph 11.01. <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary trans- <br />portation, travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, supplies, equip- <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />not owned by the workers, which are consumed <br />in the performance of the Work, and cost, less <br />market value, of such items used but not con- <br />sumed which remain the property of CON- <br />TRACTOR. <br />00700 - General Conditions REV 5-10-13.doc <br />00700-32 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st St\Admim\bid documents\Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.