My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-154 (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-154 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2016 2:40:35 PM
Creation date
3/23/2016 8:45:33 AM
Metadata
Fields
FilePath
H:\Indian River\Network Files\SL00000B\S0003V2.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
13683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File#1341 <br /> September 9, 2014 <br /> "EXHIBIT 1" <br /> WORK ORDER NO. 8 <br /> (Scope of Work) <br /> • Project Description <br /> Work Order No. 8 provides for professional services for the FDEP permit revision, a gineering, <br /> design, preparation of construction plans, specifications/bid documents, construction observation, <br /> and soils engineering for the Blue Cypress Lake new replacement package concrete Wastewater <br /> Treatment Plant and modification of the effluent disposal system. The services will include a plan <br /> and criteria for abandonment and demolition of the existing plant. <br /> The existing Blue Cypress Wastewater Treatment Plant is a steel package plant which provides <br /> tertiary treatment and serves a small fishing resort located along the shore of Blue Cypress Lake. <br /> The resort is fully developed and consists of small houses or trailers some of which are occupied <br /> full-time and others are used on occasions for recreational activities on Blue Cypress Lae primarily <br /> bass fishing. Domestic wastewater is generated by approximately (84) dwelling units and a small <br /> commercial fishing tackle shop. <br /> The existing steel package wastewater treatment plant has deteriorated badly with the steel tanks <br /> rusted and corroded beyond repair. It is estimated that the existing plant was purchased new <br /> sometime around 1975 and has been moved several times to different locations at various <br /> development projects. The plant was installed at its present location around 1992 to serve the Blue <br /> Cypress Lake Resort. Recently, Masteller & Moler, Inc. was authorized by the Indian River County <br /> Utilities Department to prepare plans to remove and repair the severely corroded steel sections of <br /> the plant in an attempt to salvage the existing plant tankage. During this assignment an J based on <br /> continued fact gathering, it became evident that it would be impossible to provide easonable <br /> assurance that the repairs would provide satisfactory results. A contractor was requested to <br /> evaluate the plant and provide a cost estimate to perform the construction work anticipated by the <br /> project design. The construction estimate was in excess of $325,000.00. Based on the cost and <br /> inability to repair the plant, the Indian River County Utilities Department has decided to a oandon the <br /> existing steel package plant and replace the plant with a new 17,000 GPD package concrete <br /> tertiary wastewater treatment plant. It is anticipated that the new package plant will utilize the <br /> existing modified effluent disposal facilities, provide reliable future service and cost less to construct <br /> than to attempt to salvage the existing plant. <br /> The work to be performed as part of this Work Order will generally include preparation of an FDEP <br /> permit revision application package; preparation of contract plans; preparation of specifications and <br /> bid documents for a new replacement package concrete wastewater treatment plant; modification <br /> of the effluent disposal system; assistance during bidding and contract administration/periodic <br /> construction observation for the project. Our services will also include a plan and criteria for <br /> abandonment and demolition of the existing plant. <br /> The estimated project cost for the New Replacement Package Concrete Wastewater Treatment <br /> Plant and abandon / demolish the existing plant covered in the Scope of Services for Work Order <br /> No. 8 is $ 300,000.00. <br /> A brief description of the scope of services and deliverables for Work Order No. 8 is provided <br /> below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.