My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-154 (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-154 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2016 2:40:35 PM
Creation date
3/23/2016 8:45:33 AM
Metadata
Fields
FilePath
H:\Indian River\Network Files\SL00000B\S0003V2.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
13683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order#8 <br /> Exhibit#1 (Scope of Work) <br /> Page 2 <br /> • Scope of Services <br /> Masteller & Moler, Inc. will prepare and submit the FDEP permit revision application package and <br /> complete project design, construction plans, specifications and bid documents, and provide <br /> services during bidding and construction. Our services will include obtaining soils engineering <br /> services as necessary to produce a bid ready project and prepare an abandonment plan and <br /> criteria for demolition and removal of the existing steel package wastewater treatment plant. <br /> Task A— Permitting Services <br /> Masteller & Moler, Inc. will prepare the FDEP permit revision application package to provide for the <br /> construction of a new 17,000 GPD replacement package tertiary treatment plant. We will prepare <br /> an Abbreviated Preliminary Engineering Report as part of the permit revision application package <br /> and submit the application to FDEP along with the Indian River County application fee check in the <br /> amount of$600.00. <br /> Task B— Engineering Services <br /> Masteller & Moler, Inc. will provide engineering design services of a new replacement 17,000 GPD <br /> package concrete wastewater treatment plant on the existing site without disturbing the existing <br /> plant. Our services will include preparation of construction plans and specifications with bid <br /> documents showing and describing the new plant which will include surge tank, duplex aeration <br /> tanks, dual final clarifier tanks, aerated digester tank, dual cell tertiary filters, and duplex chlorine <br /> tanks. The new plant process will be extended aeration with Class 3 reliability and be cesigned to <br /> meet existing FDEP effluent requirements. The plans and specifications will include related <br /> treatment plant equipment and piping such as pumps, blowers, bar screen with splitter ox, and a <br /> hypochlorination system. The existing effluent disposal facilities will be utilized. ThE plans will <br /> include modifications to the effluent disposal system as required by the FDEP. <br /> Task C— Project Biddinq Services <br /> Masteller & Moler, Inc. will work with Indian River County to allow for bidding of thE proposed <br /> construction work to be described in the Contract Plans and Technical Specifications. We shall <br /> attend a Pre-bid Meeting to describe the project to bidding contractors. We shall review the bids to <br /> be received by the County Purchasing Department and make a recommendation fora and of the <br /> contract to the lowest qualified bidder. <br /> Task D— Periodic Construction Observation and Administrative Services <br /> Masteller & Moler, Inc. will provide periodic observation of construction of the improvements <br /> described above on an as-needed basis to observe that construction is in reasonable compliance <br /> with the Contract Plans. We will also attend meetings, review shop drawings and monthly pay <br /> estimates from the Contractor. Following successful completion of the Contract work as evidenced <br /> by as-builts and testing by the selected Contractor, we shall prepare Engineer's Certificates <br /> confirming that the project improvements have been constructed in substantial conformance with <br /> design plans and specifications. <br /> As part of our services related to the new plant start-up, we shall include in the specifications a <br /> narrative describing the transition of the flow and "seeding" the new plant as part of taking the <br /> existing plant off-line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.