Laserfiche WebLink
Work Order#8 <br /> Exhibit#1 (Scope of Work) <br /> Page 3 <br /> Task E— Soils Engineering Services <br /> Masteller & Moler, Inc. will provide for soil borings and a report of findings and recomme dations to <br /> support the design and construction of the new replacement wastewater treatment plant. <br /> Task F—Abandonment Plan <br /> Masteller & Moler, Inc. will prepare and include in the project bid package specification an <br /> Abandonment Plan (AP). The AP will present the procedures for closing the existing wastewater <br /> treatment plant that will be removed from the site once operation is discontinued. This plan will also <br /> include sequential steps of action for wastewater and solids removal, cleaning and disi fection of <br /> tanks, demolition and removal of the existing steel package wastewater treatment plarit, and the <br /> time frames associated with the cleaning and demolition procedures. <br />