My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. All insurers must be authorized to do business in Florida and have a Best Key Rating of A- VII. <br />G. The insurance companies selected shall send written verification to the Indian River County Risk Manager <br />that they will provide 30 days prior written notice to the Indian River County Risk Manager of its intent to cancel <br />or modify any required policies of insurance. <br />SC 5.05 Delete existing paragraph 5.05 of the General Conditions in its entirety. <br />SC -5.06 Delete existing paragraph 5.06 of the General Conditions in its entirety. <br />SC -5.07 Delete existing paragraph 5.07 of the General Conditions in its entirety and replace with the <br />following. . <br />A. All insurance policies provided by the Contractor shall contain provisions to the effect that the insurer waives <br />all rights of subrogation against any of the insured, additional insured, (and the officers, directors, partners, <br />employees, agents, consultants and subcontractors of each and any of them) Owner and the Engineer. <br />SC -5.08. Delete existing paragraph 5.08 of the General Conditions in its entirety. <br />SC -5.09. Delete existing paragraph 5.09 of the General Conditions in its entirety. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />SC 6.0113 Delete paragraph 6.0113 of the General Conditions in its entirety, and replace with the following: <br />6.01 B The Contractor shall employ a competent superintendent and necessary assistants who shall be assigned to, <br />and in attendance at, the Project site during performance of the Work. The superintendent shall be reasonably <br />satisfactory to the Owner. So long as the superintendent remains employed by the Contractor or any related <br />entity, the superintendent shall not be replaced without the Owner's prior written consent, except under <br />extraordinary circumstances. The superintendent shall represent the Contractor, and communications given to the <br />superintendent shall be as binding as if given to the Contractor. <br />SC -6.02 C and D. Add the following new paragraphs immediately after paragraph 6.02B. of the General <br />Conditions which are to read as follows: <br />C. Regular working hours are defined as 8 hours per day, Monday through Friday, excluding holidays, between <br />the hours of 7:00 AM and 7:00 PM. Requests to work other than regular working hours shall be submitted to <br />Engineer not less than 48 hours prior to any proposed weekend work or scheduled extended work weeks. <br />Occasional unscheduled overtime on weekdays may be permitted provided two hours notice is given to Engineer. <br />D. Contractor shall reimburse the Owner for additional engineering and/or inspection costs incurred as a result of <br />overtime work in excess of the regular working hours stipulated in Article SC -6.02C. At Owner's option, <br />overtime costs may either be deducted from the Contractor's monthly payment request or deducted from the <br />retainage prior to release of final payment. Overtime costs for the Owner's personnel shall be based on the <br />individual's current overtime wage rate. Overtime costs for personnel employed by the Engineer or Owner's <br />independent testing laboratory shall be calculated in accordance with the terms of their respective contracts with <br />the Owner. <br />SC 6.04A.1. Add the following sentence immediately after the existing text in paragraph 6.04 A.1 of the General <br />Conditions: <br />Additionally, any and all changes to the Project's critical path must be reflected in each Project schedule_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.