My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -6.04.A.3. Add the following paragraph immediately after paragraph GC -6.04.A.2 of the General Conditions: <br />Contractor shall give Owner full information in advance as to its plans for performing each part of the Work. If at <br />any time during the progress of Work, Contractor's actual progress is inadequate to meets the requirements of the <br />Contract, Owner may, but is not obligated to, so notify Contractor. In such event, Contractor acknowledges and <br />agrees that Contractor shall implement some or all of the following remedial actions at the sole cost and expense <br />of Contractor: (a) Increase manpower in such quantities and crafts as necessary to eliminate the backlog of Work; <br />(b) Increase the number of working hours per shift, shifts per working day, working days per week, the amount <br />of construction equipment, or any combination of the foregoing to eliminate the backlog of Work; or (c) <br />Reschedule the Work in conformance with the specification requirements. Neither such notice by Owner nor <br />Owner's failure to issue such notice shall relieve Contractor of its obligation to achieve the quality of Work and <br />rate of progress required by the Contract. Failure of Contractor to implement some or all of the remedial actions <br />may be grounds for determination by Owner that Contractor is not prosecuting its Work with such diligence as <br />will assure completion within times specified. Upon such determination, Owner may terminate Contractor's right <br />to proceed with the performance of the Contract, or any separable part thereof, in accordance with the applicable <br />provisions of this Contract. <br />SC -6.06A. Delete Paragraph 6.06A of the General Conditions in its entirety and replace with the following: <br />A. Contractor shall not employ any Subcontractor, Supplier or other person or organization, (including those who <br />are to furnish the principal items of materials or equipment), whether initially or as a substitute, against whom <br />Owner may have reasonable objection. Acceptance of any Subcontractor, Supplier or other person or <br />organization by Owner shall not constitute a waiver of any right of Owner to reject defective Work. Contractor <br />shall not be required to employ any Subcontractor, Supplier or other person or organization against whom <br />Contractor has reasonable objection. <br />SC -6.06B Delete Paragraph 6.06B of the General Conditions in its entirety. <br />SC -6.08. Delete Paragraph 6.08 of the General Conditions in its entirety and replace with the following: <br />ALL PERMIT, IMPACT, OR INSPECTION FEES APPLICABLE AT THE TIME OF OPENING OF BIDS <br />THAT ARE PAYABLE TO INDIAN RIVER COUNTY IN CONNECTION WITH THE WORK ON THIS <br />COUNTY PROJECT WILL BE PAID BY INDIAN RIVER COUNTY. Contractor acknowledges that the <br />foregoing items are governed by the provisions of Florida Statutes section 218.80, Public Bid Disclosure Act. <br />Further, Contractor shall pay the applicable business tax and obtain a business tax receipt from the Indian River <br />County Tax Collector. Unless otherwise provided in the Contract Documents, Contractor shall obtain and pay <br />for all applicable construction permits. Owner shall reimburse Contractor for the cost of such permits on the <br />basis of actual cost. Owner shall assist Contractor, when necessary, in obtaining such permits and licenses. As <br />set forth in the Contract Documents, re -inspection fees are payable solely by Contractor. Owner shall pay all <br />charges of utility owners for connections for providing permanent services to the Work. Owner has obtained the <br />Temprary Consumptive Use Permit from the St. Johns River Water management District and such permits are <br />included in the Contract Documents in Section 01060. Owner has obtained/made application for the Indian River <br />County Minor Site Plan approval, FDEP Specific Permit to Construct PWS Components and Inidan River <br />County ROW Permit. Any permits issued after issuance of bid documents will be provided as an Addendum.. <br />Contractor acknowledges that the foregoing items are governed by the provisions of Florida Statutes section <br />218.80 (2007), Public Bid Disclosure Act. <br />SC 6.11 A.3: Delete the words: "arbitration or" in line 9 of paragraph 6.11 A.3 of the General Conditions. <br />SC 6.19A: Delete Paragraph 6.19A. of the General Conditions in its entirety and replace with the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.