A. Contractor warrants and guarantees to Owner for one (1) year from the date of Final Completion that all <br />Work will be in accordance with the Contract Documents and will not be defective; provided, however, that <br />manufacturer equipment warranties may be of a longer duration. <br />SC -6.20A. Delete paragraph 6.20A of the General Conditions in its entirety. <br />SC -6.21E. Delete paragraph 6.21E of the General Conditions in its entirety and replace with the following: <br />E. Contractor shall not be responsible for the adequacy of the performance criteria or design criteria required by <br />or contained in the Contract Documents. <br />ARTICLE 7 OTHER WORK AT THE SITE <br />SC-7.O1A. Delete paragraph 7.O1A of the General Conditions in its entirety and replace with the following: <br />7.01A. Related Work at Site. Owner may perform other work related to the Project at the Site with Owner's <br />employees, or pursuant to direct contracts with others. If such other work is not noted in the Contract <br />Documents, then written notice thereof will be given by Owner to Contractor prior to Owner starting any such <br />other work; and Contractor shall perform in accordance with Article 7 of the General Conditions. <br />ARTICLE 8 OWNER'S RESPONSIBILITIES <br />SC -8.02. Delete paragraph 8.02 of the General Conditions in its entirety and replace with the following <br />If Owner terminates the employment of Engineer, Owner may appoint another engineer whose status under the <br />Contract Documents shall be that of the former Engineer. <br />SC -8.04. Delete paragraph 8.04 of the General Conditions in its entirety and replace with the following: <br />Payments under this contract are governed by the Local Government Prompt Payment Act, Florida Statutes <br />section 218.70 et. seq., <br />SC -8.06. Delete paragraph 8.06 of the General Conditions in its entirety. <br />SC -8.11. Delete paragraph 8.11 of the General Conditions in its entirety. <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />SC 9.02. Delete the first sentence of paragraph 9.03A of the General Conditions in its entirety and replace with <br />the following: <br />A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction as Engineer <br />deems necessary in order to observe as an experienced and qualified Engineer the progress that has been made <br />and the quality -of the various aspects of Contractor's -executed Work. <br />SC -9.03B.. Add the following new paragraph B. immediately after paragraph 9.03A of the General Conditions <br />which is to read as follows: <br />B. Engineer will furnish a part-time Resident Project Representative. Contractor is responsible to give 24-hour <br />notice on all required inspections so that the Resident Project Representative may be present. <br />SC 9.04 A. Delete the third sentence of paragraph 9.04A of the General Conditions in its entirety and replace <br />with the following: <br />