My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES <br />SC 12.01A. Delete paragraph 12.01A of the General Conditions in its entirety and replace with the following: <br />The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an <br />adjustment in the Contract Price shall be based on written notice in accordance with the provisions of paragraph <br />10.05. <br />SC 12.01B2. Delete paragraph 12.01 B2 of the General Conditions in its entirety and replace with the following: <br />2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually <br />agreed lump sum. <br />SC 12.01 B3. Delete paragraph 12.01 B3 of the General Conditions in its entirety. <br />SC 12.01C. Delete paragraph 12.01 C of the General Conditions in its entirety. <br />12.03A and B. Delete paragraphs 12.03.A and 12.03B of the General Conditions in their entirety and replace <br />with the following: <br />A. Where Contractor is delayed or prevented from completing any part of the Work within the Contract <br />Times due to delay beyond the control of Contractor, the Contract Times (or Milestones) will be extended in an <br />amount equal to the time lost due to such delay if LD a Claim is made therefore as provided in paragraph 12.02.A <br />and (2) Contractor provides evidence that the delay impacted the critical path of the Project. Delays beyond the <br />control of Contractor shall include, but not be limited to, acts or neglect by Owner, acts or neglect of utility <br />owners or other contractors performing other work as contemplated by Article 7, fires, floods, abnormal weather <br />�J conditions or acts of God. The Contractor must request the extension of time in writing and must provide the <br />following information within the time periods stated hereafter. Failure to submit such information and in <br />compliance with the time requirements hereinafter stated, shall constitute a waiver by the Contractor and a denial <br />of the claim for extension of time: <br />1. Nature of the delay or change in the Work; <br />2. Dates of commencement�and cessation of the delay or change in the Work; <br />3. Activities on the current progress schedule affected by the delay or change in the Work; <br />4. Identification and demonstration that the delay or change in Work affects the critical path; <br />5. Identification of the source of delay or change in the Work; <br />6. Anticipated extent of the delay or change in the Work; and <br />7. Recommended action to minimize the delay. <br />B. Contractor hereby affirms that the extension of time granted herein is the Contractor's sole and exclusive <br />remedy. Apart from extension of time, no payment or claim for damages shall be made to the Contractor as <br />compensation for damages for any delays or hindrances from any cause whatsoever in the progress of the Work <br />whether such delay is avoidable or unavoidable. <br />SC 12.03C. Delete paragraph 12.03.0 of the General Conditions in its entirety. <br />SC 12.03D. Delete paragraph 12.03D of the General Conditions in its entirety and replace with the following: <br />In no event shall Owner, Engineer, or the Related Entities of either of them be liable to Contractor, any <br />Subcontractor, any Supplier, any other person or organization, or any surety for or employee or agent of any of <br />them, for any claim, cost, loss, or damages of any nature whatsoever arising out of or resulting from delays. <br />