0 <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES <br />SC 12.01A. Delete paragraph 12.01A of the General Conditions in its entirety and replace with the following: <br />The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an <br />adjustment in the Contract Price shall be based on written notice in accordance with the provisions of paragraph <br />10.05. <br />SC 12.01B2. Delete paragraph 12.01 B2 of the General Conditions in its entirety and replace with the following: <br />2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually <br />agreed lump sum. <br />SC 12.01 B3. Delete paragraph 12.01 B3 of the General Conditions in its entirety. <br />SC 12.01C. Delete paragraph 12.01 C of the General Conditions in its entirety. <br />12.03A and B. Delete paragraphs 12.03.A and 12.03B of the General Conditions in their entirety and replace <br />with the following: <br />A. Where Contractor is delayed or prevented from completing any part of the Work within the Contract <br />Times due to delay beyond the control of Contractor, the Contract Times (or Milestones) will be extended in an <br />amount equal to the time lost due to such delay if LD a Claim is made therefore as provided in paragraph 12.02.A <br />and (2) Contractor provides evidence that the delay impacted the critical path of the Project. Delays beyond the <br />control of Contractor shall include, but not be limited to, acts or neglect by Owner, acts or neglect of utility <br />owners or other contractors performing other work as contemplated by Article 7, fires, floods, abnormal weather <br />�J conditions or acts of God. The Contractor must request the extension of time in writing and must provide the <br />following information within the time periods stated hereafter. Failure to submit such information and in <br />compliance with the time requirements hereinafter stated, shall constitute a waiver by the Contractor and a denial <br />of the claim for extension of time: <br />1. Nature of the delay or change in the Work; <br />2. Dates of commencement�and cessation of the delay or change in the Work; <br />3. Activities on the current progress schedule affected by the delay or change in the Work; <br />4. Identification and demonstration that the delay or change in Work affects the critical path; <br />5. Identification of the source of delay or change in the Work; <br />6. Anticipated extent of the delay or change in the Work; and <br />7. Recommended action to minimize the delay. <br />B. Contractor hereby affirms that the extension of time granted herein is the Contractor's sole and exclusive <br />remedy. Apart from extension of time, no payment or claim for damages shall be made to the Contractor as <br />compensation for damages for any delays or hindrances from any cause whatsoever in the progress of the Work <br />whether such delay is avoidable or unavoidable. <br />SC 12.03C. Delete paragraph 12.03.0 of the General Conditions in its entirety. <br />SC 12.03D. Delete paragraph 12.03D of the General Conditions in its entirety and replace with the following: <br />In no event shall Owner, Engineer, or the Related Entities of either of them be liable to Contractor, any <br />Subcontractor, any Supplier, any other person or organization, or any surety for or employee or agent of any of <br />them, for any claim, cost, loss, or damages of any nature whatsoever arising out of or resulting from delays. <br />