My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
payments to all subcontractors, laborers, material, men and suppliers except as listed below: . "All <br />payments by Indian River County as Owner shall be made in accordance with the Local Government Prompt <br />Payment Act. Florida Statutes section 218.70 et. seq. <br />SC- I4.02A.3. Add a new paragraph immediately after paragraph 14.02A.3 of the General Conditions, which is <br />to read as follows: <br />4. Contractor shall furnish satisfactory proof to Owner and Engineer that payment received from Owner for <br />materials and equipment not incorporated into the Work and suitably stored, has in fact been paid to the <br />respective supplier(s) within ten (10) days of Contractor's receipt of payment from Owner. Failure to provide <br />such evidence of payment shall result in the withdrawal of previous approval(s) and removal of the cost of related <br />materials and equipment from the.next submitted Application for Payment, and shall be deemed.a default under <br />the Contract. <br />SC -14.02C.1. Delete paragraph 14.02.0 of the General Conditions in its entirety and replace with the following: <br />All payments by Indian River County as Owner shall be made in accordance with the Local Government Prompt <br />Payment Act. Florida Statutes section 218.70 et. seq. <br />SC- 14.02D. Ld. Delete paragraph 14.02D. Ld of the General Conditions in its entirety and replace with the <br />following: <br />d. OWNER has actual knowledge of the occurrence or -probable occurrence of any of the events enumerated in <br />paragraphs 14.02.B.5.a through 14.02.B.5.c or paragraph 15.02.A. <br />SC- 14.02D.2. Delete paragraph 14.02D.2 of the General Conditions in its entirety and replace with the <br />following: <br />If Owner refuses to make payment of the full amount recommended by Engineer, Owner shall provide notice to <br />Contractor in accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes <br />section 218.70 et. seq. and pay Contractor any amount remaining after deduction of the amount so withheld in <br />accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes section 218.70 et. <br />seq. Owner shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by Owner and <br />Contractor, in accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes <br />section 218.70 et. seq. <br />SC 14.02D3. Delete paragraph 14.02D3 of the General Conditions in its entirety <br />SC- 14.03A.Add the following sentences to the end of the existing paragraph 14.03A of the General Conditions <br />as follows: <br />No materials or supplies for the Work shall be purchased by Contractor or Subcontractor subject to any chattel <br />mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. <br />Contractor warrants that Contractor has good title to all materials and supplies used by Contractor in the Work, <br />free from all liens, claims or encumbrances. <br />SC -14.04C.. Delete paragraph 14.04C of the General Conditions in its entirety and replace with the following: <br />If Engineer considers the Work substantially complete, Engineer will prepare and deliver to Owner a tentative <br />certificate of Substantial Completion that shall fix the date of Substantial Completion. In accordance with the <br />provisions of Florida Statutes section 208.735(7)(x)(2008), upon receipt of the tentative certificate of Substantial <br />Completion from Engineer, the Owner, the Engineer, and the Contractor shall conduct a walk-through inspection <br />of the Project to document a list of any items required to render the Work on the Project complete, satisfactory, <br />and acceptable under this Agreement (herein the "Statutory List"). The Statutory List shall be reduced to writing <br />and circulated among the Owner, the Engineer, and the Contractor by the Owner or the Engineer within 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.