payments to all subcontractors, laborers, material, men and suppliers except as listed below: . "All <br />payments by Indian River County as Owner shall be made in accordance with the Local Government Prompt <br />Payment Act. Florida Statutes section 218.70 et. seq. <br />SC- I4.02A.3. Add a new paragraph immediately after paragraph 14.02A.3 of the General Conditions, which is <br />to read as follows: <br />4. Contractor shall furnish satisfactory proof to Owner and Engineer that payment received from Owner for <br />materials and equipment not incorporated into the Work and suitably stored, has in fact been paid to the <br />respective supplier(s) within ten (10) days of Contractor's receipt of payment from Owner. Failure to provide <br />such evidence of payment shall result in the withdrawal of previous approval(s) and removal of the cost of related <br />materials and equipment from the.next submitted Application for Payment, and shall be deemed.a default under <br />the Contract. <br />SC -14.02C.1. Delete paragraph 14.02.0 of the General Conditions in its entirety and replace with the following: <br />All payments by Indian River County as Owner shall be made in accordance with the Local Government Prompt <br />Payment Act. Florida Statutes section 218.70 et. seq. <br />SC- 14.02D. Ld. Delete paragraph 14.02D. Ld of the General Conditions in its entirety and replace with the <br />following: <br />d. OWNER has actual knowledge of the occurrence or -probable occurrence of any of the events enumerated in <br />paragraphs 14.02.B.5.a through 14.02.B.5.c or paragraph 15.02.A. <br />SC- 14.02D.2. Delete paragraph 14.02D.2 of the General Conditions in its entirety and replace with the <br />following: <br />If Owner refuses to make payment of the full amount recommended by Engineer, Owner shall provide notice to <br />Contractor in accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes <br />section 218.70 et. seq. and pay Contractor any amount remaining after deduction of the amount so withheld in <br />accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes section 218.70 et. <br />seq. Owner shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by Owner and <br />Contractor, in accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes <br />section 218.70 et. seq. <br />SC 14.02D3. Delete paragraph 14.02D3 of the General Conditions in its entirety <br />SC- 14.03A.Add the following sentences to the end of the existing paragraph 14.03A of the General Conditions <br />as follows: <br />No materials or supplies for the Work shall be purchased by Contractor or Subcontractor subject to any chattel <br />mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. <br />Contractor warrants that Contractor has good title to all materials and supplies used by Contractor in the Work, <br />free from all liens, claims or encumbrances. <br />SC -14.04C.. Delete paragraph 14.04C of the General Conditions in its entirety and replace with the following: <br />If Engineer considers the Work substantially complete, Engineer will prepare and deliver to Owner a tentative <br />certificate of Substantial Completion that shall fix the date of Substantial Completion. In accordance with the <br />provisions of Florida Statutes section 208.735(7)(x)(2008), upon receipt of the tentative certificate of Substantial <br />Completion from Engineer, the Owner, the Engineer, and the Contractor shall conduct a walk-through inspection <br />of the Project to document a list of any items required to render the Work on the Project complete, satisfactory, <br />and acceptable under this Agreement (herein the "Statutory List"). The Statutory List shall be reduced to writing <br />and circulated among the Owner, the Engineer, and the Contractor by the Owner or the Engineer within 30 <br />