My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calendar days after substantial completion. The Owner and Contractor acknowledge and agree that: 1) the failure <br />to include any corrective work, or pending items that are not yet completed, on the Statutory List does not alter <br />the responsibility of the Contractor to complete all of the Work under this Agreement; 2) upon completion of all <br />items on the Statutory List, the Contractor may submit a pay request for all remaining retainage except as <br />otherwise set forth in this Agreement; and 3) any and all items that require correction under this Agreement and <br />that are identified after the preparation of the Statutory List remain the obligation of the Contractor to complete to <br />the Owner's satisfaction under this Agreement. After receipt of the Statutory List by the Contractor, the <br />Contractor acknowledges and agrees that it will diligently proceed to complete all items on the Statutory List and <br />schedule a final walk-through in anticipation of final completion on the Project. <br />SC 14.04D. Delete paragraph 14.04D of the General Conditions in its entirety and replace with the following: <br />At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to Owner and <br />Contractor a written recommendation as to division of responsibilities pending final payment between Owner and <br />Contractor with respect to security, operation, safety, and protection of the Work, maintenance, heat, utilities, <br />insurance, and warranties and guarantees. <br />SC 14.07A.3. Delete paragraph 14.07A.3 of the General Conditions in its entirety. <br />SC -14.07B.1. Delete paragraph 14.0713.1 of the General Conditions in its entirety and replace with the <br />following: <br />1. If, on the basis of Engineer's observation of the Work during construction and final inspection, and Engineer's <br />review of the final Application for Payment and accompanying documentation, all as required by the Contract <br />Documents, Engineer is satisfied that the Work has been completed and Contractor's other obligations under the <br />Contract Documents have been fulfilled, Engineer will indicate, within twenty days after receipt of the final <br />Application for Payment, in writing Engineer's recommendation of payment and present the Application to <br />Owner for payment. Thereupon Engineer will give written notice to Owner and Contractor that the Work is <br />acceptable. Otherwise, Engineer will return the Application for Payment to Contractor, indicating in writing the <br />reasons for refusing to recommend final payment, in which case Contractor shall make the necessary corrections <br />and resubmit the Application for Payment. <br />SC -14.07.C.1. Delete paragraph GC- 14.07.C.I in its entirety and replace with the following: Payment shall be <br />made by Owner to Contractor according to the Local Government Prompt Payment Act, Florida Statutes section <br />218. et.seq. <br />SC 14.08. Delete paragraph 14.08 of the General Conditions in its entirety. <br />SC 14.09. Delete paragraph 14.09 of the General Conditions in its entirety. <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br />SC- I5.02.A.1. Delete subparagraph 15.02.A.I of the General Conditions in its entirety, and replace with the <br />following: <br />1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents; <br />SC- I 5.02.A.4. Delete subparagraph 15.02.A.4 of the General Conditions in its entirety, and replace with the <br />following: <br />4. Contractor's violation of any material provisions of the Contract Documents. <br />SC 15.02.A.5 and 6. Add the following new subparagraphs at the end of paragraph GC- 15.02.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.