My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT: Indian River County North WTP Raw Water Transmission System <br />DATE OF ISSUANCE <br />OWNER Indian River County Board of County Commissioners <br />OWNER's Contract No. Project No. <br />CONTRACTOR ,ENGINEER PBS&J, Inc. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the <br />following specified parts thereof: <br />To: <br />And To <br />IWAR`[W3 <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, <br />CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in <br />accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, <br />and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all <br />the Work in accordance with the contract Documents. The items in the tentative list shall be completed or <br />corrected by CONTRACTOR within Days of the above date of Substantial Completion. <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.