My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From the date of Substantial Completion, the responsibilities between OWNER and CONTRACTOR for <br />security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as <br />follows: <br />RESPONSIBILITIES: <br />OWNER: <br />CONTRACTOR: <br />The following documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other specifically <br />noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents <br />nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract <br />Documents. <br />Executed by ENGINEER on <br />ENGINEER <br />(Authorized Signature) <br />CONTRACTOR accepts this Certificate of Substantial Completion on , 20 <br />CONTRACTOR <br />OWNER accepts this Certificate of Substantial Completion on 20 <br />(Authorized Signature) <br />00800-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.