Laserfiche WebLink
3. LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract Documents or approve any substitute <br />materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods, <br />techniques,, sequences or procedures of construction unless such is specifically called for <br />in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />6. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />END OF SECTION <br />00800-37 <br />