My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />NORTI-I WTP RAW WATER TRANSMISSION SYSTEM <br />UPC PROJECT NUMBER 2422 <br />INDIAN RIVER COUNTY BID NUMBER: 2010024 <br />ADDENDUM NUMBER 2 <br />January 15, 2010 <br />CLARIFICATIONS: <br />The column pipe. described in Specification Section 11211 2.02 1, shall be 8" Schedule 40 316 Stainless <br />Steel with flanged connections. Each well shall be supplied with 60 feet of column pipe. <br />Question 1: Need to verify facts on electrical underground duct banks. On spec section] 6405, it calls <br />out to totally encase gives no b <br />duct hanks in 2500lhs concrete and rehar on sleet e-3 it g <br />- ` <br />description of how this is to be.done. No rebar tie points or distance between points. Also. <br />iJt, makes. reference to encasements under.roadways. if conduits are direction bored under. <br />roadways no encasements should be necessary. Please verify these facts this is a,.costly. <br />factor if all conduit duct banks are to be concrete encased. <br />Response l : The duct banks do not have to be concrete encased. <br />V raw ""YThis. Addendum MUST be retuned with -your Bid" <br />All Bids rnii5t be received by the Ptirchasni Division office located at 1800 2 `n Street., <br />-Vero Beach. FL 32960. Prior to 2:00 P.M. on Januar} 11, 2010. Late bids will be rettirned <br />Irriopeiied., <br />C Mlipaiiy 1Variie r1 VV1ckL/ CSEc_ <br />Nie Ivin �'Slc 2_ <br />Title.: <br />aypz"Printerl) <br />Ailthorized Signatilre: �� Date: D <br />Telephone:" ('7 2 — j6 Ll Fax: `7 v7 X88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.