Laserfiche WebLink
M Bidder has familiarized itself with the nature and extent of the Contract <br />Documents, the work, site, locality, and all local conditions and laws and <br />regulations that in any manner may affect cost, progress, performance or finishing <br />of the work. <br />(c) Bidder has studied carefully all reports and drawings of subsurface conditions <br />and drawings of physical conditions which are identified in Paragraph SC -4.02 of <br />the Supplementary:. Conditions of the extent of the technical data contained in <br />such reports and drawings upon which Bidder is entitled to rely. <br />(d) Bidder has obtained and carefully studied (or assumes responsibility for obtaining <br />and carefully studying) all such examinations, investigations, explorations, tests, <br />reports and studies (in addition to or to supplement those referred to in (c) above) <br />which pertain to the subsurface or physical conditions at or contiguous to the site <br />or otherwise may affect the cost, progress, performance or furnishing of the work <br />as Bidder considers necessary for the performance or furnishing of the work at <br />the contract price, within the contract time and in accordance with the other terms <br />and conditions, of the contract documents, including specifically the provisions of <br />Paragraph 4.02 of the General Conditions; and no additional examination, <br />investigations; explorations, test, reports, studies or similar information or date or <br />will be 7equired by Bidder for such purposes. <br />(e) Bidder has reviewed and checked all information and data shown or indicated on <br />the Contract, Documents with respect to existing underground facilities at or <br />contiguous to the site and assumes responsibility for the accurate location of said <br />underground facilities. No additional examinations, investigations, explorations, <br />tests, reports,. studies or similar information or data in respect of said <br />underground- facilities are or will be required by Bidder in order to perform and <br />i.. <br />-\ furnish the work at the contract price, within the contract time and in accordance <br />(✓� with the 1 other terms and conditions of the Contract Documents, <br />including <br />specifically. -the. provisions of Paragraph 4.04 of the General Conditions. <br />(f) Bidder has correlated the results of all such observations, examinations, <br />investigations, , explorations, tests, reports and studies with the terms and <br />conditions of the Contract Documents. <br />(g) Bidder has given Engineer written notice of all conflicts, errors or discrepancies <br />that it , has discovered: in the Contract Documents and the written resolution <br />thereof by Engineer is acceptable to Bidder. <br />(h) This bid is genuine- and not made in the interest of or on behalf of any <br />10 <br />undisclosed person, firth, or corporation and is not submitted in conformity with <br />any agreement or rules of any group, association, organization or corporation; <br />Bidder has not directly or indirectly induced or solicited any other Bidder to submit <br />a false or sham Bid; Bidder has not solicited or induced any person, firmor <br />corporation to refrain from bidding; and Bidder has not sought by collusion to <br />obtain for itself any advantage over any other Bidder or over Owner. <br />4. Bidder will complete and. include with the bid the Schedule of Bid Items attached to this <br />proposal. The quantities shown on the Schedule of Bid Items are approximate quantities <br />to be used for. the purpose of comparing bids. The actual quantities may vary. It is further <br />understood that the actual amount of the Agreement, and payments there under, will be <br />r \ based upon the actual quantities placed into the work. <br />