indirectly, in whole or in part, by Contractor, any Subcon-
<br />tractor, Supplier, or any other individual or entity directly
<br />or indirectly employed by any of them to perform any of
<br />the Work, or anyone for whose acts any of them may be
<br />liable, shall be remedied by Contractor (except damage or
<br />loss attributable to the fault of Drawings or Specifications
<br />or to the acts or omissions of Owner or Engineer or , or
<br />anyone employed by any of them, or anyone for whose
<br />acts any of them may be liable, and not attributable,
<br />directly or indirectly, in whole or in part, to the fault or
<br />negligence of Contractor or any Subcontractor, Supplier,
<br />or other individual or entity directly or indirectly em-
<br />ployed by any of them).
<br />D. Contractor's duties and responsibilities for safety and
<br />for protection of the Work shall continue until such time
<br />as all the Work is completed and Engineer has issued a
<br />notice to Owner and Contractor in accordance with
<br />Paragraph 14.07.13 that the Work is acceptable (except as
<br />otherwise expressly provided in connection with
<br />Substantial Completion).
<br />6.14 Safety Representative
<br />A. Contractor shall designate a qualified and experienced
<br />safety representative at the Site whose duties and
<br />responsibilities shall be the prevention of accidents and
<br />the maintaining and supervising of safety precautions and
<br />programs.
<br />6.15 Hazard Communication Programs
<br />A. Contractor shall be responsible for coordinating any
<br />exchange of material safety data sheets or other hazard
<br />communication information required to be made available
<br />to or exchanged between or among employers at the Site
<br />in accordance with Laws or Regulations.
<br />6.16 Emergencies
<br />A. In emergencies affecting the safety or protection of
<br />persons or the Work or property at the Site or adjacent
<br />thereto, Contractor is obligated to act to prevent
<br />threatened damage, injury, or loss. Contractor shall give
<br />Engineer prompt written notice if Contractor believes that
<br />any significant changes in the Work or variations from the
<br />Contract Documents have been caused thereby or are
<br />required as a result thereof. If Engineer determines that a
<br />change in the Contract Documents is required because of
<br />the action taken by Contractor in response to such an
<br />emergency, a Work Change Directive or Change Order
<br />will be issued.
<br />6.17 Shop Drawings and Samples
<br />A. Contractor shall submit Shop Drawings and Samples
<br />to Engineer for review and approval in accordance with
<br />the acceptable Schedule of Submittals (as required by
<br />Paragraph 2.07). Each submittal will be identified as
<br />Engineer may require.
<br />1. Shop Drawings
<br />a. Submit number of copies specified in the
<br />General Requirements.
<br />b. Data shown on the Shop Drawings will be
<br />complete with respect to quantities, dimensions,
<br />specified performance and design criteria,
<br />materials, and similar data to show Engineer the
<br />services, materials, and equipment Contractor
<br />proposes to provide and to enable Engineer to
<br />review the information for the limited purposes
<br />required by Paragraph 6.17.D.
<br />2. Samples: Contractor shall also submit Samples to
<br />Engineer for review and approval in accordance with
<br />the acceptable schedule of Shop Drawings and
<br />Sample submittals.
<br />a. Submit number of Samples specified in the
<br />Specifications.
<br />b. Clearly identify each Sample as to material,
<br />Supplier, pertinent data such as catalog numbers,
<br />the use for which intended and other data as
<br />Engineer may require to enable Engineer to
<br />review the submittal for the limited purposes
<br />required by Paragraph 6.17.D.
<br />B. Where a Shop Drawing or Sample is required by the
<br />Contract Documents or the Schedule of Submittals, any
<br />related Work performed prior to Engineer's review and
<br />approval of the pertinent submittal will be at the sole
<br />expense and responsibility of Contractor.
<br />C. Submittal Procedures
<br />1. Before submitting each Shop Drawing or
<br />Sample, Contractor shall have determined and veri-
<br />fied:
<br />a. all field measurements, quantities, dimen-
<br />sions, specified performance and design criteria,
<br />installation requirements, materials, catalog
<br />numbers, and similar information with respect
<br />thereto;
<br />b. the suitability of all materials with respect to
<br />intended use, fabrication, shipping, handling,
<br />storage, assembly, and installation pertaining to
<br />the performance of the Work;
<br />c. all information relative to Contractor's
<br />responsibilities for means, methods, techniques,
<br />sequences, and procedures of construction, and
<br />safety precautions and programs incident thereto;
<br />and
<br />d. shall also have reviewed and coordinated each
<br />Shop Drawing or Sample with other Shop
<br />Drawings and Samples and with the
<br />LJCDC C-700 Standard General Conditions of the Construction Contract.
<br />Copyright O 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />00700-23