Laserfiche WebLink
requirements of the Work and the Contract <br />Documents. <br />2. Each submittal shall bear a stamp or specific <br />written certification that Contractor has satisfied <br />Contractor's obligations under the " Contract <br />Documents with respect to Contractor's review and <br />approval of that submittal. <br />3. With each submittal, Contractor shall give <br />Engineer specific written notice of any variations, <br />that the Shop Drawing or Sample may have from the <br />requirements of the Contract Documents. This notice <br />shall be both a written communication separate from <br />the Shop Drawing's or Sample Submittal; and, in <br />addition, by a specific notation made on each Shop <br />Drawing or Sample submitted to Engineer for review <br />and approval of each such variation. <br />D. Engineer's Review <br />1. Engineer will provide timely review of Shop <br />Drawings and Samples in accordance with the Sched- <br />ule of Submittals acceptable to Engineer. Engineer's <br />review and approval will be only to determine if the <br />items covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents and be <br />compatible with the design concept of the completed <br />Project as a functioning whole as indicated by the <br />Contract Documents. <br />2. Engineer's review and approval will not extend <br />to means, methods, techniques, sequences, or <br />procedures of construction (except where a particular <br />means, method, technique, sequence, or procedure of <br />construction is specifically and expressly called for <br />by the Contract Documents) or to safety precautions <br />or programs incident thereto. The review and <br />approval of a separate item as such will not indicate <br />approval of the assembly in which the item functions. <br />3. Engineer's review and approval shall not relieve <br />Contractor from responsibility for any variation from <br />the requirements of the Contract Documents unless <br />Contractor has complied with the requirements of <br />Paragraph 6.17.C.3 and Engineer has given written <br />approval of each such variation by specific written <br />notation thereof incorporated in or accompanying the <br />Shop Drawing or Sample. Engineer's review and <br />approval shall not relieve Contractor from <br />responsibility for complying with the requirements of <br />Paragraph 6.17.C.1. <br />E. Resubmittal Procedures <br />1. Contractor shall make corrections required by <br />\ Engineer and shall return the required number of cor- <br />rected copies of Shop Drawings and submit, as <br />required, new Samples for review and approval. <br />Contractor shall direct specific attention in writing to <br />revisions other than the corrections called for by <br />Engineer on previous submittals. <br />6.18 Continuing the Work <br />A. Contractor shall carry on the Work and adhere to the <br />Progress Schedule during all disputes or disagreements <br />with Owner. No Work shall be delayed or postponed <br />pending resolution of any disputes or disagreements, <br />except as permitted by Paragraph 15.04 or as Owner and <br />Contractor may otherwise agree in writing. <br />6.19 Contractor's General Warranty and Guarantee <br />A. Contractor warrants and guarantees to Owner that all <br />Work will be in accordance with the Contract Documents <br />and will not be defective. Engineer and its Related <br />Entities shall be entitled to rely on representation of <br />Contractor's warranty and guarantee. <br />B. Contractor's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper maintenance or <br />operation by persons other than Contractor, Sub- <br />contractors, Suppliers, or any other individual or <br />entity for whom Contractor is responsible; or <br />2. normal wear and tear under normal usage. <br />C. Contractor's obligation to perform and complete the <br />Work in accordance with the Contract Documents shall be <br />absolute. None of the following will constitute an <br />acceptance of Work that is not in accordance with the <br />Contract Documents or a release of Contractor's <br />obligation to perform the Work in accordance with the <br />Contract Documents: <br />observations by Engineer; <br />2. recommendation by Engineer or payment by <br />Owner of any progress or final payment; <br />3. the issuance of a certificate of Substantial <br />Completion by Engineer or any payment related <br />thereto by Owner; <br />4. use or occupancy of the Work or any part thereof <br />by Owner; <br />5. any review and approval of a Shop Drawing or <br />Sample submittal or the issuance of a notice of <br />acceptability by Engineer; <br />6. any inspection, test, or approval by others; or <br />7. any correction of defective Work by Owner. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-24 <br />