My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements of the Work and the Contract <br />Documents. <br />2. Each submittal shall bear a stamp or specific <br />written certification that Contractor has satisfied <br />Contractor's obligations under the " Contract <br />Documents with respect to Contractor's review and <br />approval of that submittal. <br />3. With each submittal, Contractor shall give <br />Engineer specific written notice of any variations, <br />that the Shop Drawing or Sample may have from the <br />requirements of the Contract Documents. This notice <br />shall be both a written communication separate from <br />the Shop Drawing's or Sample Submittal; and, in <br />addition, by a specific notation made on each Shop <br />Drawing or Sample submitted to Engineer for review <br />and approval of each such variation. <br />D. Engineer's Review <br />1. Engineer will provide timely review of Shop <br />Drawings and Samples in accordance with the Sched- <br />ule of Submittals acceptable to Engineer. Engineer's <br />review and approval will be only to determine if the <br />items covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents and be <br />compatible with the design concept of the completed <br />Project as a functioning whole as indicated by the <br />Contract Documents. <br />2. Engineer's review and approval will not extend <br />to means, methods, techniques, sequences, or <br />procedures of construction (except where a particular <br />means, method, technique, sequence, or procedure of <br />construction is specifically and expressly called for <br />by the Contract Documents) or to safety precautions <br />or programs incident thereto. The review and <br />approval of a separate item as such will not indicate <br />approval of the assembly in which the item functions. <br />3. Engineer's review and approval shall not relieve <br />Contractor from responsibility for any variation from <br />the requirements of the Contract Documents unless <br />Contractor has complied with the requirements of <br />Paragraph 6.17.C.3 and Engineer has given written <br />approval of each such variation by specific written <br />notation thereof incorporated in or accompanying the <br />Shop Drawing or Sample. Engineer's review and <br />approval shall not relieve Contractor from <br />responsibility for complying with the requirements of <br />Paragraph 6.17.C.1. <br />E. Resubmittal Procedures <br />1. Contractor shall make corrections required by <br />\ Engineer and shall return the required number of cor- <br />rected copies of Shop Drawings and submit, as <br />required, new Samples for review and approval. <br />Contractor shall direct specific attention in writing to <br />revisions other than the corrections called for by <br />Engineer on previous submittals. <br />6.18 Continuing the Work <br />A. Contractor shall carry on the Work and adhere to the <br />Progress Schedule during all disputes or disagreements <br />with Owner. No Work shall be delayed or postponed <br />pending resolution of any disputes or disagreements, <br />except as permitted by Paragraph 15.04 or as Owner and <br />Contractor may otherwise agree in writing. <br />6.19 Contractor's General Warranty and Guarantee <br />A. Contractor warrants and guarantees to Owner that all <br />Work will be in accordance with the Contract Documents <br />and will not be defective. Engineer and its Related <br />Entities shall be entitled to rely on representation of <br />Contractor's warranty and guarantee. <br />B. Contractor's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper maintenance or <br />operation by persons other than Contractor, Sub- <br />contractors, Suppliers, or any other individual or <br />entity for whom Contractor is responsible; or <br />2. normal wear and tear under normal usage. <br />C. Contractor's obligation to perform and complete the <br />Work in accordance with the Contract Documents shall be <br />absolute. None of the following will constitute an <br />acceptance of Work that is not in accordance with the <br />Contract Documents or a release of Contractor's <br />obligation to perform the Work in accordance with the <br />Contract Documents: <br />observations by Engineer; <br />2. recommendation by Engineer or payment by <br />Owner of any progress or final payment; <br />3. the issuance of a certificate of Substantial <br />Completion by Engineer or any payment related <br />thereto by Owner; <br />4. use or occupancy of the Work or any part thereof <br />by Owner; <br />5. any review and approval of a Shop Drawing or <br />Sample submittal or the issuance of a notice of <br />acceptability by Engineer; <br />6. any inspection, test, or approval by others; or <br />7. any correction of defective Work by Owner. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.