My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPPLEMENTARY CONDITIONS <br />PART I - AMENDMENTS TO GENERAL CONDITIONS <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the <br />Construction Contract (EJCDC Document No. C-700, 2002 edition) and other provisions of the <br />Contract Documents as indicated below. All provisions which are not so amended or supplemented <br />remain in full force and effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />SC -1.01A.43. <br />Delete paragraph 1.01 A.43. of the General Conditions in its entirety and replace with the following: <br />43. Specifications - Sections included under Division 1 through Division 2 of the Project Manual. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />SC -2.01 B. <br />Delete paragraph 2.01 B of the General Conditions in its entirety and replace with the following: <br />B. Before any Work at the site is started, Contractor shall deliver to Owner, with copies to Engineer, <br />certificates of insurance, which Contractor is required to purchase and maintain in accordance with <br />the requirements of the Contract Documents. <br />SC 2.03A <br />Delete paragraph 2.03A of the General Conditions in its entirety, and replace with the following: <br />The Contract Times will commence to run on the day indicated in the Notice to Proceed. A <br />Notice to Proceed may be given at any time within 60 days after the Effective Date of the <br />Agreement. <br />SC 2.05A1 Add the following immediately at the end of subparagraph 2.05A1: using the Critical <br />Path Method (CPM). <br />SC 2.05A.4 Add new subparagraph 4 after the existing text of 2.05 of the General Conditions: <br />4. If this Project is an addition to an existing working plant, then the Contractor shall coordinate <br />with the Owner on tie-ins. The Owner shall have final say on plant shut down times and duration to <br />make tie-ins. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC -3.01 C <br />Add a new paragraph immediately after Paragraph 3.01 C of the General Conditions which is to read <br />as follows: <br />00800-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.