My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nothing herein shall be deemed to affect the rights, privileges, and immunities of the County as set <br />forth in Florida Statute Section 768.28. <br />In any and all claims against the County or any of its agents or employees, by any employee of the <br />contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for <br />whose acts any of them may be liable, the indemnification obligation under the previous paragraph <br />shall not be limitedthein any way as to the amount contractor or any subcontractor runder Wo kee of n's Compensationnpl <br />on or benefits <br />or <br />payable by or fActs, disability <br />benefit acts, or other employee benefit acts. <br />SC -6.21 E <br />Delete paragraph 6.21 E of the General Conditions in its entirety and replace with the following: <br />E. Contractor shall not be responsible for the adequacy of the performance criteria or design <br />criteria required by or contained in the Contract Documents. <br />ARTICLE 8 OWNER'S RESPONSIBILITIES <br />SC -8.02 Delete paragraph 8.02 of the General Conditions in its entirety and replace with the <br />following <br />If Owner terminates the employment of Engineer, Owner may appoint another engineer whose <br />status under the Contract Documents shall be that of the former Engineer. <br />SC -8.04 Delete paragraph 8.04 of the General Conditions in its entirety and replace with the <br />following: <br />Payments under this contract are governed by the Local Government Prompt Payment Act, Florida <br />Statutes section 218.70 et. seq., <br />SC -8.06 <br />Delete paragraph 8.06 of the General Conditions in its entirety. <br />SC -8.11 <br />Delete paragraph 8.11 of the General Conditions in its entirety. <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />SC 9.02 Delete the first sentence of paragraph 9.03A of the General Conditions in its entirety and <br />replace with the following: <br />A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction <br />pr Engineer-deemshas been maderand the quality -of the various aspects of Contin order to observe as an experienced dractorl qualified <br />Engineer <br />Work. <br />progress that <br />SC -9.03A <br />Add the following new paragraph immediately after paragraph 9.03A of the General Conditions <br />(� which is to read as follows: <br />00800-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.