My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( B. Engineer will furnish a part-time Resident Project Representative. Contractor is responsible to <br />give 24-hour notice on all required inspections so that the Resident Project Representative may be <br />present. <br />SC 9.04 A Delete the third sentence of paragraph 9.04A of the General Conditions in its entirety and <br />replace with the following: <br />However, if Contractor claims entitlement to additional time or money as a result of the Field Order, <br />such entitlement is conditioned upon obtaining a Change Order authorized and executed by Owner <br />after timely making a Claim as provided in the Contract Documents. <br />SC 9.08-A: <br />Delete the second sentence of 9.08A of the General Conditions in its entirety and replace with the <br />following: <br />Except for: (a) Claims for differing subsurface or physical conditions governed by paragraph 4.03; <br />and (b) claims for time extensions governed by paragraph 12.03, all matters in question and other <br />matters between Owner and Contractor arising prior to the date final payment is due, relating to the <br />acceptability of the Work and the interpretation of the requirements of the contract documents <br />pertaining to the performance of the Work, will be referred initially to Engineer in writing within 15 <br />days after occurrence of the event giving rise to such Claim or within 15 days after the claimant first <br />recognizes the condition giving rise to the Claim, whichever is later; provided, however, the Owner <br />shall make all final determination of such matters. <br />SC 9.08-C Delete paragraph 9.08-C of the General Conditions in its entirety <br />SC 9.08-D Delete paragraph 9.08-D of the General Conditions in its entirety <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />SC 10.03 A.3 Delete subparagraph 10.03.A.3 of the General Conditions in its entirety <br />SC 10.05.A Delete paragraph 10.05.A of the General Conditions in its entirety and replace with the <br />following: <br />A. All Claims shall initially be referred to the Engineer for decision. <br />SC 10.05.6 Delete paragraph 10.05.6 of the General Conditions in its entirety and replace with the <br />following: <br />Except for: (a) Claims for differing subsurface or physical conditions governed by paragraph 4.03; <br />and (b) claims for time extensions governed by paragraph 12.03, Claims by either party shall be <br />initiated within 15 days after occurrence of the event giving rise to such Claim or within 15 days after <br />the claimant first recognizes the condition giving rise to the Claim, whichever is later, by written <br />notice of the amount or extent of the Claim, dispute, or other matter with supporting data to the <br />Engineer and the other party by written notice stating the general nature of each Claim, dispute, or <br />other matter delivered by the claimant to Engineer and the other party to the Contract. A Claim for an <br />adjustment in Contract Price shall be prepared, in accordance with the provisions of paragraph <br />12.01.6. A Claim for an adjustment in Contract Time shall be prepared in accordance with the <br />provisions of paragraph 12.02.13. No claim by the Contractor for an equitable adjustment hereunder <br />(� shall be allowed if asserted after final payment under this Contract. <br />00800-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.