My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC 10.05 C Delete paragraph 10.05C of the General Conditions in its entirety. <br />SC 10.05 D and E Delete paragraphs 10.05.D and E of the General Conditions in their entirety <br />ARTICLE 11 - COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK <br />SC -11.02A Delete paragraph 11.02.A of the General Conditions in its entirety and replace with the <br />following: <br />It is understood that CONTRACTOR has included in the Contract Price all allowances so named in <br />the Contract Documents and shall cause the Work so covered to be performed for such sums as <br />may be acceptable to OWNER. <br />Delete paragraphs 11.0213 through D of the General Conditions in their entirety. <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES <br />SC12.01 C Delete 15 percent" in line 2 of paragraph 12.01 C.2.a of the General Conditions and <br />replace with "10 percent". <br />SC12.01 C Delete "15 percent" in line 6 of paragraph 12.01 C.2.c of the General Conditions and <br />replace with 10 percent". <br />12.03A and B Delete paragraphs 12.03.A and 12.0313 of the General Conditions in their entirety <br />and replace with the following: <br />A. Where Contractor is delayed or prevented from completing any part of the Work within the <br />Contract Times due to delay beyond the control of Contractor, the Contract Times (or Milestones) <br />will be extended in an amount equal to the time lost due to such delay if M a Claim is made <br />therefore as provided in paragraph 12.02.A and (2) Contractor provides evidence that the delay <br />impacted the critical path of the Project. Delays beyond the control of Contractor shall include, but <br />not be limited to, acts or neglect by Owner, acts or neglect of utility owners or other contractors <br />performing other work as contemplated by Article 7, fires, floods, abnormal weather conditions or <br />acts of God. The Contractor must request the extension of time in writing and must provide the <br />following information within the time periods stated hereafter. Failure to submit such information and <br />in compliance with the time requirements hereinafter stated, shall constitute a waiver by the <br />Contractor and a denial of the claim for extension of time: <br />1. Nature of the delay or change in the Work; <br />2. Dates of commencement and cessation of the delay or change in the Work; <br />3. Activities on the current progress schedule affected by the delay or change in the Work; <br />4. Identification and demonstration that the delay or change in Work affects the critical path; <br />5. Identification of the source of delay or change in the Work; <br />6. Anticipated extent of the delay or change in the Work; and <br />7. Recommended action to minimize the delay. <br />B. Contractor hereby affirms that the extension of time granted herein is the Contractor's sole and <br />exclusive remedy. Apart from extension of time, no payment or claim for damages shall be made to <br />the Contractor as compensation for damages for any delays or hindrances from any cause <br />whatsoever in the progress of the Work whether such delay is avoidable or unavoidable. <br />< < SC 12.03C Delete paragraph 12.03.0 of the General Conditions in its entirety. <br />00800-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.