SC 12.03D Delete paragraph 12.03D of the General Conditions in its entirety and replace with <br />( the following: <br />In no event shall Owner, Engineer, or the Related Entities of either of them be liable to <br />Contractor, any Subcontractor,soplother person <br />organization, surety for <br />or employee or agent of any of themfor claim, loss, damages of or any nate <br />whatsoever arising out of or resulting from delays. <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />SC 13.04C Delete the words: "arbitration or" in line 10 of paragraph 13.04.0 of the General <br />Conditions. <br />SC 13.06A Delete the words: "arbitration or" in line 9 of paragraph 13.06.A of the General <br />Conditions. <br />SC13.07A Add the following sentence at the beginning of paragraph 13.07.A of the General <br />Conditions: <br />The Owner and Contractor agree that a warranty inspection shall be scheduled no later than eleven <br />(11) months after final payment under this Contract so that the Owner and the Contractor may <br />inspect and otherwise examine the Work prior to the expiration of the Public Construction Bond <br />SC 13.07E Delete paragraph 13.07E of the General Conditions in its entirety and replace with the <br />following: <br />Contractor's obligations under this paragraph 13.07 are in addition to any other obligation or <br />warranty. The provisions of this paragraph 13.07 shall not be construed as a substitute for or a <br />waiver of the provisions of any applicable statute of limitation or any way to limit the Contractor's <br />continued liability for defective Work, including latent defects. <br />SC 13.08A TWO changes: <br />1. Delete the words: "arbitration or" in line 8 of paragraph 13.08.A of the General Conditions. <br />2. Delete the phrase "(such costs to be approved by Engineer as to reasonableness)" in lines 10 <br />and 11 of paragraph 13.08.A of the General Conditions. <br />13.09C Delete the words: "arbitration or" in line 4 of paragraph 13.09.0 of the General Conditions. <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br />SC -14.02A.1 <br />Delete the first sentence of paragraph 14.02.A.1 of the General Conditions in its entirety and replace <br />with the following: <br />On or before the tenth (10`h) day of each month, the Contractor shall submit completed partial <br />progress payment requests to the Engineer, as set forth herein. Contractor shall submit to Engineer <br />for review an Application for Payment filled out and signed by Contractor covering the Work <br />completed as of the date of the Application for Payment and accompanied by such supporting <br />documentation as is required by the Contract Documents. Such supporting documents shall include <br />but not be limited to, the required Contractor's certification; retainage as set forth in the Agreement; <br />( and a monthly dated CPM schedule for the Project. The Contractor shall make the following <br />( certification (Affidavit) on each Application for Payment: "I hereby certify that the labor and materials <br />00800-13 <br />