My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
listed on this Application for Payment have been used in the construction of this Work and payment <br />i received from the last request for payment has been used to make payments to all subcontractors, <br />laborers, material, men and suppliers except as listed below: "All payments by Indian River County <br />as Owner shall be made in accordance with the Local Government Prompt Payment Act. Florida <br />Statutes section 218.70 et. seq. <br />SC -14.02A.3 <br />Add a new paragraph immediately after paragraph 14.02A.3 of the General Conditions, which is to <br />read as follows: <br />4. Contractor shall furnish satisfactory proof to Owner and Engineer that payment received from <br />Owner for materials and equipment not incorporated into the Work and suitably stored, has in fact <br />been paid to the respective supplier(s) within ten (10) days of Contractor's receipt of payment from <br />Owner. Failure to provide such evidence of payment shall result in the withdrawal of previous <br />approval(s) and removal <br />of the cost of related materials and and shall be deemed a default under the' Contract ment m the next submitted <br />Application for Payment, <br />SC -14.02C.1 Delete paragraph 14.02.0 of the General Conditions in its entirety and replace with the <br />following: All payments by Indian River County as Owner shall be made in accordance with the <br />Local Government Prompt Payment Act. Florida Statutes section 218.70 et. seq. <br />SC-14.02D.1.d Delete paragraph 14.02D.1.d of the General Conditions in its entirety and replace <br />with the following: du Oated i has actual knowledge of the occurrence paragraphs 14 02.B 5 a through 14 02 B 5 or -Probable or paragraphrrence 15 02.Af <br />any of the events e p <br />SC -14.02D.2 Delete paragraph 14.02D.2 of the General Conditions in its entirety and replace with <br />the following: <br />If Owner refuses to make payment of the full amount recommended by Engineer, Owner shall <br />provide notice to Contractor in accordance with the provisions of the Local Government Prompt <br />Payment Act. Florida Statutes section 218.70 et. seq. and pay Contractor any amount remaining <br />after deduction of the amount so withheld in accordance with the provisions of the Local <br />Government Prompt Payment Act. Florida Statutes section 218.70 et. seq. Owner shall pay <br />Contractor the amount so withheld, or any adjustment thereto agreed to by Owner and Contractor, in <br />accordance with the provisions of the Local Government Prompt Payment Act. Florida Statutes <br />section 218.70 et. seq. <br />SC -14.03A. <br />Add the following sentences to the end of the existing paragraph 14.03A of the General Conditions <br />as follows: <br />No materials or supplies for the Work shall be purchased by Contractor or Subcontractor subject to <br />any chattel mortgage or under a conditional sale contract or other agreement by which an interest is <br />retained by the seller. Contractor warrants that Contractor has good title to all materials and supplies <br />used by Contractor in the Work, free from all liens, claims or encumbrances. <br />SC -14.04C. Delete paragraph 14.04C of the General Conditions in its entirety and replace with the <br />following: <br />If Engineer considers the Work substantially complete, Engineer will prepare and deliver to Owner a <br />tentative certificate of Substantial Completion that shall fix the date of Substantial Completion. In <br />accordance with the provisions of Florida Statutes section 208.735(7) (a) (2005), upon receipt of the <br />00800-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.