My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION FOR PAYMENT <br />INSTRUCTIONS <br />A. GENERAL INFORMATION <br />The sample form of Schedule of Values is intended as a guide only. Many projects require a more <br />extensive form with space for numerous items, descriptions of Change Orders, identification of <br />variable quantity adjustments, summary of materials and equipment stored at the site and other <br />information. It is expected that a separate form will be developed by Engineer and Contractor at the <br />time Contractor's schedule of Values is finalized. Note also that the format for retainage must be <br />changed if the Contract permits (or the law provides), and Contractor elects to deposit securities in <br />lieu of retainage. Refer to Article 14 of the General Conditions for provisions concerning payments to <br />Contractor. <br />B. COMPLETING THE FORM <br />The Schedule of Values, submitted and approved as provided in paragraphs 2.05.13.3 and 2.07 of <br />the General Conditions should be reproduced as appropriate in the space indicated on the <br />Application for Payment form. Note that the cost of materials and equipment is often listed <br />separately from the cost of installation. Also, note that each Unit Price is deemed to include <br />Contractor's overhead and profit. <br />All Change Orders affecting the Contract Price should be identified and included in the Schedule of <br />Values as required for progress payments. <br />The form is suitable for use in the Final Application for Payment as well as for Progress Payments; <br />however, the required accompanying documentation is usually more extensive for final payment. All <br />accompanying documentation should be identified in the space provided on the form. <br />C. LEGAL REVIEW <br />All accompanying documentation of a legal nature, such as Lien Waivers, should be reviews by an <br />attorney, and Engineer should so advise Owner. <br />00800-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.