My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT WEST REGIONAL WWTP ANAEROBIC TANKS ODOR CONTROL SYSTEM <br />DESIGN <br />DATE OF ISSUANCE <br />OWNER Indian River County Board of County Commissioners <br />OWNER's Contract No. <br />CONTRACTOR <br />Project No. UCP 4067 <br />ENGINEER Michael C. Hotchkiss, P.E. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to <br />the following specified parts thereof: <br />To: Indian River County <br />OWNER <br />And To <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to <br />complete all the Work in accordance with the contract Documents. The items in the tentative list <br />shall be completed or corrected by CONTRACTOR within Days of the above date of <br />Substantial Completion. <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.