My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From the date of Substantial Completion, the responsibilities between OWNER and CONTRACTOR <br />for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees <br />shall be as follows: <br />RESPONSIBILITIES: <br />OWNER: <br />CONTRACTOR: <br />The following documents are attached to and made a part of this Certificate: <br />[For items to be attached see definition of Substantial Completion as supplemented and other <br />specifically noted conditions precedent to achieving Substantial Completion as required by Contract <br />Documents.] <br />This certificate does not constitute an acceptance of Work not in accordance with the Contract <br />Documents <br />nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the <br />Contract <br />Documents. <br />Executed by ENGINEER on <br />ENGINEER <br />By: <br />(Authorized Signature) <br />CONTRACTOR accepts this Certificate of Substantial Completion on , 20_ <br />CONTRACTOR <br />LM <br />OWNER accepts this Certificate of Substantial Completion on , 20_ <br />OWNER <br />(Authorized Signature) <br />00800-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.