Laserfiche WebLink
C i than eight (8) full working hours) shall not be credited toward the specified durations. <br />Training shall not be concurrent with on-going testing debugging or installation activities; <br />but shall be a separate activity devoted exclusively to the instruction of the Owner's <br />personnel in the operation and maintenance of the Manufacturer's equipment. Training <br />shall be performed by qualified representatives of each equipment Manufacturer <br />specifically skilled in providing instruction to operation personnel. Training shall provide <br />an overview of operations and maintenance requirements and shall include but not be <br />limited to: <br />1. Description of unit and component parts, <br />2. Operating capabilities and performance criteria, <br />3. Operating procedures, <br />4. Maintenance procedures, <br />5. Servicing and lubrication schedules, <br />6. Troubleshooting, and <br />7. Electrical instrumentation and control requirements and in <br />as a minimum. <br />The operating and maintenance data to be provided in accordance with <br />Specification Section 01730 shall be used as a basis for training. <br />F. A certificate from the Manufacturer stating that the installation of the equipment is <br />satisfactory, that the unit has been satisfactorily tested, is ready for operation, and that the <br />operating personnel have been suitably instructed in the operation, lubrication, and care of <br />the unit shall be submitted before start-up and acceptance by the Owner. The certificate <br />-1-..,, A,,+o —A +;, ;, etnwt;nn Waq u;ven and names of operating personnel in <br />