My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The Contractor shall employ a disinfection method approved by the Engineer and Owner, <br />and shall fully satisfy the Owner that adequate disinfection has been achieved prior to <br />placing a facility on-line. <br />C. The Contractor, in the presence of the Owner, will be responsible for the collection of all <br />water samples. The samples shall be collected in accordance with best management <br />processes in Chapter 17-550, 17-555 and 17-560, F.A.C. and submitted to a NELAC <br />approved analytical laboratory for analyses of the required constituents. <br />D. The cost of all disinfection work shall be included in the Lump Sum Bid and the <br />Contractor shall pay for all bacteriological clearance tests. <br />1.27 SERVICES OF MANUFACTURERS' FIELD SERVICE TECHNICIAN <br />A. Bid prices of equipment furnished under Divisions 11, 14, 1.5, and 16 shall include the <br />cost of a competent field service technician of the Manufacturers of all equipment to <br />supervise the installation, adjustment, and testing of the equipment and to instruct the <br />Owner's operating personnel on operation and maintenance. The approved Manufacturer's <br />operation and maintenance data as specified in Section 01730 shall be delivered to the <br />Engineer prior to instructing the Owner's personnel. This supervision may be divided into <br />two or more time periods as required by the installation program or as directed by the <br />Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.