Laserfiche WebLink
B. Accidents shall be reported immediately to the Engineer by messenger or phone. <br />C. All accidents shall be documented by the Contractor and a fully detailed written report <br />submitted by the Contractor to the Engineer after each accident. <br />1.22 TRAFFIC CONTROL <br />A. The Contractor shall ensure that vehicular flow is maintained in a safe manner and shall <br />adhere to all State and Local requirements for maintenance of traffic, safety precautions, and <br />lighting. Should the Owner request the preparation and submittal of a traffic maintenance <br />and/or safety plan, the Contractor will do so, at no additional cost to the Owner, within 21 <br />days of receipt of request. <br />1.23 WORK ADJACENT TO UTILITY FACILITIES <br />A. The attention of the Contractor is drawn to existing overhead and underground utility facilities <br />in the area of the Work. The Contractor shall protect all existing utility transmission and <br />distribution. facilities tbroughout the period of construction and shall notify the offices all <br />utility companies at least 72 hours prior to the start of any construction. <br />B. It is the full and complete responsibility of the Contractor to determine the exact location of all <br />overhead and underground utility transmission and distribution facilities in the area of the <br />VU -1, nr not tlk— ara in(liratarl nn tlh nrawinac <br />