My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Accidents shall be reported immediately to the Engineer by messenger or phone. <br />C. All accidents shall be documented by the Contractor and a fully detailed written report <br />submitted by the Contractor to the Engineer after each accident. <br />1.22 TRAFFIC CONTROL <br />A. The Contractor shall ensure that vehicular flow is maintained in a safe manner and shall <br />adhere to all State and Local requirements for maintenance of traffic, safety precautions, and <br />lighting. Should the Owner request the preparation and submittal of a traffic maintenance <br />and/or safety plan, the Contractor will do so, at no additional cost to the Owner, within 21 <br />days of receipt of request. <br />1.23 WORK ADJACENT TO UTILITY FACILITIES <br />A. The attention of the Contractor is drawn to existing overhead and underground utility facilities <br />in the area of the Work. The Contractor shall protect all existing utility transmission and <br />distribution. facilities tbroughout the period of construction and shall notify the offices all <br />utility companies at least 72 hours prior to the start of any construction. <br />B. It is the full and complete responsibility of the Contractor to determine the exact location of all <br />overhead and underground utility transmission and distribution facilities in the area of the <br />VU -1, nr not tlk— ara in(liratarl nn tlh nrawinac <br />
The URL can be used to link to this page
Your browser does not support the video tag.