My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are not appoved on the <br />rst <br />D. Shop drawings which eschedu ed, as well as pipelinesaand tanks which dont pass leak <br />mittal or within the schedued tim <br />shall be immediately r <br />tests. <br />E. The contract completion time will be adjusted only for causes specified in this contract. <br />In the event the Contractor requests an extension of any contract completion date, he <br />shall furnish such justification and supporting evidence as the Engineer may deem <br />necessary for determination as to whether the Contractor is entitled to an extension of <br />time under the provisions of the contract. Engineer will, after receipt of such justification <br />and supporting evidence make findings of fact and will advise the Contractor in writing <br />thereof. If the Engineer finds that the Contractor is entitled to any extension of any <br />contract completion date under the provisions of this contract, <br />the Engineer's <br />determination as to the total number of days of extension shall be based upon the <br />currently approved schedule and on all data relevant to the extension. Such data shall be <br />included in the next monthly updating of the schedule. The Contractor acknowledges and <br />agrees that actual delays in activities which, according to the schedule, do not affect any <br />e schedule do not have any <br />contract completion date shown by the citical path in <br />on date or dat s, and therefore, hwi 1 not be he bass for a change affect <br />on the contract compl <br />therein. <br />F. From time to time it may be necessary for the contract schedule and/or completion time <br />to be adjusted by the Engineer to reflect the effects of job conditions, weather, technical <br />.iiffin„ lties. strikes, unavoidable delays on the part of the Owner orchis+repres antatives, <br />
The URL can be used to link to this page
Your browser does not support the video tag.