Laserfiche WebLink
(� on the cover sheet. The cover sheet shall fully describe the packaged data and include a <br />listing of all items within the package. Provide to the Resident Project Representative a <br />copy of each transmittal sheet for shop drawings, product data and samples at the time of <br />submittal to the Engineer. <br />C. The Contractor shall utilize the following Shop Drawing numbering system: <br />1, The Submittal Log Number shall reference the Specification Section Number, <br />2, The numbering system shall be specification section number followed by a "1" <br />for original submittal, "IA" for first resubmittal and so forth, (for example: <br />15050-1, 15050-1A, 150504B...) <br />D. Notify the Engineer in writing, at the time of submittal, of any deviations in the <br />submittals from the requirements of the Contract Documents. <br />E. The review and approval of shop drawings, samples or product data by the Engineer shall <br />not relieve the Contractoroferror and ohe responsibility for the mission are assumed by the1llment of the Contractor a d h terms <br />Engil neer <br />Contract. All risks of <br />will have no responsibility therefor. <br />F. No portion of the work requiring a shop drawing, sample, or product data shall be started <br />nor shall any materials be fabricated or installed prior to the approval or qualified <br />approval of such item. Fabrication performed, materials purchased or on-site construction <br />ar.r.mmnlished which does not conform to approved shop drawings and data shall be at the <br />