My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any revisions made other than the corrections requested by the Engineer on previous <br />submissions. <br />ge as to the <br />F. Partial submittals may ittbe Submittals not complete will be returned tothe the <br />completeness of a submitt <br />and will be considered "Not Approved" until resubmitted. The Engineer may at his option <br />provide a list or mark the submittal directing the Contractor to the areas that are <br />incomplete. <br />G. Repetitive Review <br />I, Shop Drawings and other submittals will be reviewed no more than twice at the <br />Owner's expense. All subsequent reviews will be performed at times convenient <br />to the Engineer and at the Contractor's expense based on the Engineer's then <br />prevailing rates. The Contractor shall reimburse the Owner for all such fees <br />invoiced to the Owner by the Engineer. Submittals are required until approved, <br />2. Any need for more than one resubmission, or any other delay in obtaining <br />Engineer's review of submittal will not entitle Contractor to extension of the <br />contract time. <br />on the shop <br />s to constitute a <br />H. If the Contractor tract Documents, the Contractor rs any correction shall give written notice thereof to the <br />change to the Contract D <br />Engineer at least 7 working days prior to release for manufacture. <br />. . , . of the F,ngineer, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.