My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Within 30 days after the effective date of the Agreement, submit to the Resident Project <br />t <br />for the <br />Representative, data relating to materialsProjecto enable the R P data Prto of ct Repree furnishess tat ve <br />work. Such data shall be in sufficient <br />or Engineer to identify the particular product and to form an opinion as to its conformity to <br />the specifications. The data shall comply with Section 01340. <br />C. Facilities and labor for handling and <br />Proje t tion of Represe tativmaterials ane orgEngineer requr es, <br />furnished by the Contractor. If the Resident <br />either prior to beginning or during the progresso demonstrate that they conform to the submit samples of materials <br />for such special tests as may be necessary packed, and shipped as directed at <br />specifications. Such samples shall be furnished, stored, <br />otherwise noted, the Owner will make arrangements <br />the Contractor's expense. Except as <br />for and pay for the tests. <br />D. Submit data and samples sufficiently early to permit consideration and approval before <br />ulting <br />materials are necessary for incorporation in the w lr sh 1 not be use <br />against <br />as a basis ny delay of approval sof claim <br />from the failure to submit samples or data promptly hal — <br />against the Owner or the Engineer. <br />the <br />ice among <br />E. In order to demonstrate the rofiand cy Of workmen or surfaces provide suoh samples of workmanship or <br />several textures, types, finishes <br />finish as may be required. <br />..1-11-rrP,,nnnd to the approved samples <br />
The URL can be used to link to this page
Your browser does not support the video tag.