My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1, Deliver products in undamaged condition, in manufacturer's original containers or <br />packaging, with identifying labels intact and legible. <br />2. Immediately on delivery, inspect shiments to assure complianc with <br />Contract Documents and approved submittals, and that products <br />requirements of <br />are properly protected and undamaged. <br />B , provide equipment and personnel to handle products by methods to prevent soiling or <br />damage to products or packaging. <br />C. The Delivery, Storage and Handling of all equipment and supplies shall comply with <br />Section 01600. <br />1.06 STORAGE AND PROTECTION <br />providing d storage structure d non- <br />A. Furnish a coverenmnt for alrmechanical equipment, valves,architectural items, electrical <br />corrosive enviroeto be into this <br />and instrumentation equipment and special ripment e Witt' the 'instruct onsf or storage" of project. <br />Storage of equipment shall be in strict Placing of <br />each equipment supplier and manufacturer including connection of heaters, p g <br />storage lubricants in equipment, etc, <br />oflsh a copy a 1 equipmof the ent and materials.Corrodedtionsfnr <br />storage to the Engineer poor to storage <br />damaged or deteriorated equipmentoandoparts shall <br />dewillnot be inaced oluded in a payment <br />project. Equipment and materials properly <br />P.ctimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.