My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. All materials which, in the opinion of the Engineer, have become so damaged as to be <br />unfit for the use intended or specified shall be promptly removed from the site of the work <br />and the Contractor shall receive no compensation for the damaged material or its removal. <br />F. Arrange storage in a manner to provide easy access for inspection. Make periodic <br />inspections of stored products to assure that products are maintained under specified <br />conditions and free from damage or deterioration. <br />G. Protection after Installation <br />I Provide substantial coverings as necessary to protect installed products from <br />damage from traffic and subsequent construction operations. Remove covering <br />when no longer needed. <br />H. The Contractor shall be responsible for all material, equipment and supplies sold and <br />delivered to the Owner under this Contract until final inspection of the w <br />aork and <br />cceptance thereof by the Owner. In the event any such material, equipment and supplies <br />are lost, stolen, damaged, or destroyed prior to final inspection and acceptance, the <br />Contractor shall replace same without additional cost to the Owner. <br />I, Failure to take proper action on storage and handling of equipment o has been givenpthe Owner retains <br />lied under this <br />Contract within seven days after written notice t <br />the right to correct all deficiencies noted in previously transmitted written notice and <br />deduct the cost associated with these corrections from the Contract. These costs may be <br />---ni7ged of expenditures for labor, equipment usage, administrative, clerical, <br />- - -lot; <br />
The URL can be used to link to this page
Your browser does not support the video tag.