Laserfiche WebLink
E. All materials which, in the opinion of the Engineer, have become so damaged as to be <br />unfit for the use intended or specified shall be promptly removed from the site of the work <br />and the Contractor shall receive no compensation for the damaged material or its removal. <br />F. Arrange storage in a manner to provide easy access for inspection. Make periodic <br />inspections of stored products to assure that products are maintained under specified <br />conditions and free from damage or deterioration. <br />G. Protection after Installation <br />I Provide substantial coverings as necessary to protect installed products from <br />damage from traffic and subsequent construction operations. Remove covering <br />when no longer needed. <br />H. The Contractor shall be responsible for all material, equipment and supplies sold and <br />delivered to the Owner under this Contract until final inspection of the w <br />aork and <br />cceptance thereof by the Owner. In the event any such material, equipment and supplies <br />are lost, stolen, damaged, or destroyed prior to final inspection and acceptance, the <br />Contractor shall replace same without additional cost to the Owner. <br />I, Failure to take proper action on storage and handling of equipment o has been givenpthe Owner retains <br />lied under this <br />Contract within seven days after written notice t <br />the right to correct all deficiencies noted in previously transmitted written notice and <br />deduct the cost associated with these corrections from the Contract. These costs may be <br />---ni7ged of expenditures for labor, equipment usage, administrative, clerical, <br />- - -lot; <br />