Laserfiche WebLink
B. The operation, testing and adjustment shall be as required to prove that the equipment has <br />been left in proper condition for satisfactory operation under the conditions specified. <br />C. Upon completion of this work, the manufacturer's field service technician shall submit a <br />signed report of the results of his/her inspection, operation, adjustments and tests. <br />3.02 STARTUP AND ACCEPTANCE <br />A. General Requirements <br />1. Successfully execute the step-by-step procedure of startup and performance <br />demonstration specified herein. <br />2. The startup and performance demonstration shall be successfully executed prior to <br />Substantial Completion and acceptance by the Owner. <br />3. All performance tests and inspections shall be scheduled at least 5 working days <br />in advance or as otherwise specified with the Owner and the Engineer. All <br />performance tests and inspections shall be conducted during the workweek of <br />Monday through Friday, unless otherwise specified. <br />B. Preparation for Startup <br />1. All mechanical and electrical equipment shall be checked to ensure that they are <br />in good working order and properly connected. Preliminary equipment operation <br />shall be conducted. All systems shall be cleaned and purged as required. All <br />sumps, tanks, basins, chambers, pump wells and pipelines which are hydraulically <br />checked shall be drained and returned to their original condition once the testing <br />